
13.
Locate 1
Shelf Support (2H) - 3/4” x 1 1/2” x 17 3/4”
and position on
vertical shelf support and rear wall framing. Drill pilot hole in support to
prevent splitting and attach with
1 - 1 1/4” Screw (E)
on each end.
Note
- Make sure shelf support is level prior to attaching. Attach second
Shelf Support to side wall framing as described and shown to the right.
Place
Shelf (2I)
on top of shelf supports.
Shelf Support (2H).
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 8
11.
Side walls are pre-drilled at top front. Before attaching header to side walls, have your helper
hold header and wall steady. Secure with
2 - 2 1/2” Screws (C)
per side.
12.
Shelving may be mounted on left or right side of Chalet. This manual illustrates the shelving being
mounted on the left side. First, locate the
Vertical Shelf Support (2G) 1 1/2” x 1 1/2” x 35”
.
Measure 19” from left side wall framing from the inside. Mark position on door header. Drill pilot hole
near end of shelf support to prevent splitting and attach to door header with
1 - 2 1/2” Screw (C)
.
20 1/2”
19”
Drill Pilot Hole to
prevent Splitting.
Door Header
1 - 2 1/2”
Screw
.
V
ert. Shelf Support
Shelf (2I).
V
ert. Shelf Support
Positioned 3/4” on Side
Wall framing.
Drill pilot
hole before screwing.