
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 14
26.
Position Right Side Door as per
Steps 24 - 25
. Once again, use only
1 - 2” Black Screw (H)
per hinge
initially to secure door to vertical door frame trim. Open and close both doors to confirm proper door closing.
Re-adjust door screws if necessary. When satisfied, complete hinge attachments with
2
additional
2” Black
Screws (H)
per hinge.
1 - 2” Black
Screw initially.
Complete with 2 additional 2” Black
Screws per hinge when doors are
positioned correctly.
Gap between
doors will be
covered by
door flange
(4C).
Door flange (4C)
to be positioned
on left door.
27.
Open Left Door and position
Door Flange (4C)
- 1/2” x 2 1/2” x 61 3/8”
flush against horizontal door trim
making sure also to align evenly at top and bottom of door trim.
From the inside, screw flange to door with
6 - 1” Silver Screws (F)
.
Important
- Drill pilot holes first to prevent splitting of wood.
Left Door
Left Door
Hor. Door
Trim