
20.
Carefully lift and place completed
Shingle Roof Panel (3)
on wall framing and door header. At
the front, recess the plywood sheathing of the roof slightly back 1/8”.
21.
Align plywood sheathing of the roof evenly from side to side as illustrated above.
Recessed 1/8”
back from Header.
Header
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 11
22.
From inside the chalet, secure roof to wall framing and door header. You will need to use
8 - 2”
Screws (D)
for the sides and rear and
4 - 2 1/2” Screws (C)
angled from the header into the roof
sheathing for the front header section.
Angle 2 1/2” Screws from
header into plywood roof
sheathing.
2” screws from plate into
plywood roof sheathing.