9.
With Floor Runners attached, carefully flip the floor over and place on your foundation.
Caution:
you will need 2 people to assist you. Be careful when laying floor down not to bend or twist
floor. When in place, level floor completely.
Concrete Slab
Foundation
10.
Position
Plywood Floor
pieces
(4) on top
of completed Floor Joists. Plywood will sit
slightly back from outside edge of Floor Joist
Framing.
The Plywood is cut slightly
smaller than floor framing. Keep plywood
seams tight.
Hint:
Use a chalk
line to mark location
of floor joists to
determine screw
placement.
11.
With Plywood positioned correctly on floor framing,
attach with 1 1/4” screws. Use screws every 16”.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 6
plywood
pushed together
at seams.