Optional
- Caulking
seams will help prevent
moisture from entering
your shed.
Caulking
not included in kit.
Angle
screws into perimeter
Floor Joists.
32”
Pilot Hole
first.
20.
When all walls are attached together, check alignment with the floor. Bottom
of wall frames should sit flush with outside of floor framing, with siding overhanging
by approximately 1/2”. Confirm 32” wide door opening at bottom. When positioned
correctly, fasten bottom wall plates to floor using
4 - 2 1/2” Screws
per wall panel.
Hardware
S1
- 2 1/2” Screws
x 36 total
21.
Position a
Side Top Plate
on top wall framing so they are flush. Attach by screwing down into
top of wall frame with
4 - 2” Screws
.
Parts (Steps 21 - 22)
Side Wall Top Plates
- Angle Cut Ends
(3/4” x 2 1/2” x 75”)
x 2
Front & Rear Wall Top Plates
- Angle Cut Edge
(3/4” x 2 1/2” x 50”)
x 4
Hardware (Steps 21 - 22)
S3
- 2” Screws
x 24 total
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 15