Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 11
22.
Secure Core Brace
Assembly to Main Joists with
4 - 3” screws. Make sure tops of
Interior Core Brace and Main
Joists are flush with each other
as Decking will sit on this
attached in
Steps 50-64.
Flush
23.
With all Mid Joist Assemblies secured,
screw the “T” Post Mount into Rim Joist from
inside with 2 - 3” screws on angles. Be care-
ful to screw on angle so fastener does not
come through Rim Joist. Complete all 8
sides.
Important:
Use a level to confirm all
Floor Joists are level and
that the overall Floor is level.
Adjust as necessary.
Support Floor Structure as
required.
Make sure that Posts are
plumb. Check each Post in
both directions with a level
and adjust as required.
“T” Post Mount
and Rim Joist at
same height.