![OLT 6x6 Little Cedar Playhouse Скачать руководство пользователя страница 8](http://html.mh-extra.com/html/olt/6x6-little-cedar-playhouse/6x6-little-cedar-playhouse_assembly-manual_732328008.webp)
12.
Starting at the left rear corner, move the
Left Gable Side Window Wall Panel
into place on floor.
Proper wall positioning is important. From the rear, make sure wall framing sits flush on the floor.
NOTE:
Do Not Screw Wall Panel to Floor At This Stage.
View
from
back
of Playhouse
Front
Wall Plate flush
with floor
2x3 Wall
Plate
Siding
overhangs
by 1/2”
Left
Gable
Side Wall
Panel
13.
Position first
Solid Backwall Panel
in the corner next to Left Gable Sidewall Panel.
14.
Align the Solid Backwall Panel Bottom Wall
Plate flush with the floor. When positioned correctly,
screw both panels together with 3 - 2 1/2” screws into
vertical studs at the bottom, middle and top locations.
Backwall
Panel
Siding
overhangs
floor by 1/2”
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 8