A. Floor Section
2.
Position completed Floor Joist Frames together and attach with 5 - 2 1/2” screws per section.
Attached together, your Floor Joist section should be
75” wide x 70” deep
.
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 4
Flush with Floor Framing
8 1/4”
12 1/4”
2 1/2”
screws
1.
Complete
Floor Joist Frames.
Frames require two interior Floor Joist attachments. Measure
joist (8 1/4”) from inside of Floor Joist Frame to inside of Floor Joist and attach with 2 - 2 1/2” screws
per end. Complete attachments of both Floor Joists and both Floor Joist Frames.
Front
75”
70”
3.
Attach
Floor Runners
to completed Floor Frame. There are two Floor Runners per 70” side and
four completed runners in total. Use 6 - 2 1/2” screws per Runner to secure.
You can find the
Square Drive Bit
for the screws in
with the Hardware
Kit Bag.