![OLT 6x6 Little Cedar Playhouse Скачать руководство пользователя страница 12](http://html.mh-extra.com/html/olt/6x6-little-cedar-playhouse/6x6-little-cedar-playhouse_assembly-manual_732328012.webp)
24.
Push Roof Ridge Beam down into support pocket, making sure beam does not extend higher
than gable framing. Attach with two Simpson Strong Ties using 4 - 1 1/4” screws per side.
C. Porch Section
25.
Locate all
Corner Filler Trims
. Filler Trims will be positioned in each corner. Filler Trims are
2 1/2” wide x
15/16”
thick except for the
Right Front Corner
, which will be
4 11/16” wide x 11/16” Thick
.
Attach each with 6 - finishing nails.
4 11/16” wide
Filler Trim
2 1/2” wide
Filler Trim
Right Front
Corner
4 11/16”
26.
Attach
Rear Corner Filler Trims
(both are 2 1/2” wide x 15/16” thick) using 6 finishing nails per
piece. Locate
Front Corner Wide Trim (4 11/16” wide x 56 3/4”)
and
Door Stop Trim
.
2 1/2”
Rear Filler Trim
Front Corner
Wide Trim
(4 11/16” wide x
56 3/4”)
Door Stop Trim
(2 1/2” wide)
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 12
59”
long