![OLT 6x6 Little Cedar Playhouse Скачать руководство пользователя страница 11](http://html.mh-extra.com/html/olt/6x6-little-cedar-playhouse/6x6-little-cedar-playhouse_assembly-manual_732328011.webp)
21.
Attach the
Right Side Door Jamb
to Right Side Gable Window Wall Panel stud. Make sure
Door Jamb is flush with floor and flush with wall stud. Use 3 - 2 1/2” screws to secure. Next, attach
the
Door Header
to Door Jamb and Top Plate of Narrow Wall. Use 4 - 2 1/2” screws to secure.
22.
Before fastening walls
to floor, check wall alignment.
Once again, the 2x3
bottom wall framing should sit
flush on outside of floor with
wall siding overhanging by
1/2”. When positioned
correctly, attach walls to floor
with 4 - 2 1/2” screws per
panel. Screw from bottom
wall framing into floor.
IMPORTANT:
Check door
opening measurement at top
and bottom. It should be
23 1/2”
.
Door
Jamb
Door
Header
23.
Locate and attach
Plywood Ridge Beam Supports
to gable peaks with 2 - 1 1/4” screws. Place
Roof Ridge Beam
between gables into Ridge Beam Support pocket.
Do not extend
past gable
framing
Toll Free 1-888-658-1658 www.outdoorlivingtoday.com [email protected]
Page 11
Angle
screws into perimeter
Floor Joists.