LB51100 Installation and User Manual 

Shenzhen Olipower Energy & Automation Technology., Ltd 

 

 

 
 
 

 

 

        High voltage may cause an electric shock, which results in serious injury, 

death, or serious property damage from the LB51100 in operation. Prior to maintenance, power off 
the LB51100 and strictly comply with the safety precautions in this document and associated 
documents to operate the 

LB51100

 

Maintain the LB51100 with sufficient knowledge of this document, proper 
tools, and testing equipment. 

 

Before performing maintenance tasks, power off the LB51100 and wait at least 
5 minutes. 

 

Temporary warning signs or fences must be placed to prevent unauthorized 
people from entering the site. 

 

If the LB51100 is faulty, contact your supplier. 

 

The LB51100 can be powered on only after all faults are rectified. Failing to do so 
may escalate faults or damage the  device. 

 

Observe ESD precautions and wear ESD gloves during maintenance. 

Regular Maintenance 

Items 

Time 

Cleaning case using soft cloth 

Once 6 months 

Cleaning ventilation hole using soft brush 

Once a year 

Discharge to SOH 50% when not to use in 3month 

On demand 

Fully charge discharge to SOH 25% 

Once a year 

Disposal 

 

The battery energy storage system must not be disposed of with domestic waste to 
fulfill the regulations and legal enquiry. The user has the responsibility and 
obligation to send it to the designated organization for recycling and disposal. 

 
 
 

5

 

System Installation 

 

5.1

 

Installation notice 

a)

 

Before installation, check the battery open circuit voltage. 

b)

 

Battery installation location should be away from heat and avoid produce spark. The safety distance should be 

above than 0.5m. 

c)

 

Battery installing connecting cables should be as short as possible, to prevent excessive line pressure drop. 

d)

 

Batteries with different capacity, different P/N or different manufactures are not allowed for connection. 

e)

 

Before conducting the battery, the battery positive and negative poles need to be carefully checked as well to 

ensure correct installation. 

f)

 

The mounting floor should be horizontal. 

g)

 

The battery IP Rating is IP20 and is for indoor installations only. 

h)

 

For Australian market, the battery energy storage system can only be mounted into battery cabinet or rack using screw firmed 
tightly and racks can be stand together without space. And distance between batteries is 5mm as least. Battery cabinets/racks 
are not provided with battery and are outside the scope of product certification. 

i)

 

Distances of any standoff from a wall, floor, ceiling/roof is 0.5m at least; Distance from any heat source (e.g. hot water 
systems, gas heaters or the like) is 0.5m at least; Distance/clearances from any equipment/wall/structure to the sides, bottom, 

Содержание LB51100

Страница 1: ...LB51100 Installation and User Manual 1 Shenzhen Olipower Energy Automation Technology Ltd LB51100 Installation and User Manual Version V1 0...

Страница 2: ...Introduction 6 4 2 Identifying The Product 6 4 3 Maintenance and Replacement 6 5 System Installation 7 5 1 Installation notice 7 5 2 Package information and system configuration list 7 5 2 1 Parts li...

Страница 3: ...Battery box activate and shutdown 14 6 1 Panel buttons and LEDs meaning 14 6 2 The operation steps of the battery box works alone 14 6 2 1 Start battery box 14 6 2 2 Shut down battery box 14 6 2 3 Lo...

Страница 4: ...Shenzhen Olipower Energy Automation Technology Ltd Due to product upgrades or other reasons this document will make appropriate adjustments Unless otherwise agreed this document is intended to be used...

Страница 5: ...s Manual This is the Manual for the low voltage 48V residential rack battery products User of this device or installer must refer to the installation guidance to installation and using correctly 2 2 U...

Страница 6: ...following precautions is not fully understood or has any problems please contact the customer service officer for assistance The safety part may not include all the regulations in your area The use of...

Страница 7: ...ill the regulations and legal enquiry The user has the responsibility and obligation to send it to the designated organization for recycling and disposal 5 System Installation 5 1 Installation notice...

Страница 8: ...ed in cartons and the components assort with the battery case When you confirm the good s please read the configuration list carefully to make sure that the battery box and kit are intact 5 2 1 Parts...

Страница 9: ...e to side along the wall until the mounting card on the battery box is placed in the proper position of the rack mounting position Information Rack mounted installation is suggested that the external...

Страница 10: ...as a parallel battery B B Battery negative The two negative are the same one of which can be used as a parallel battery B Attention B interface RJ45 port corresponding to the CAN bus pin definition R...

Страница 11: ...drawing is for reference only please take the material as the standard It is an Australia installation standard requirement AS NZS 5139 that an overcurrent protection and isolation device that operat...

Страница 12: ...tch after the need to restart the battery box restart the settings will take effect Single battery box through the LINK communication connection to the inverter when the address DIP switch defined as...

Страница 13: ...1 and slave battery box 2 if have slave battery box 2 Step 4 After the battery is completed in parallel it is suggested that you wait a few minutes to connect the inverter later 5 4 3 2 The connection...

Страница 14: ...the DIP switch is defined as follows CAUTION Set the DIP switch after the need to restart the battery box restart the settings will take effect Three battery boxes in parallel when the DIP switch is...

Страница 15: ...FF Turn on or off button Control battery box on or off RUN Running indicator light green When the battery box is running normally it always bright LOW BAT Low battery indicator yellow When the battery...

Страница 16: ...off run LED no longer flashing just on after 90S means the battery into the normal charging mode the battery is not detected charging after 90S the fault red LED will flashing the battery cannot be r...

Страница 17: ...attery box and the inverter is normal When the battery box is running fault indicator lights up The battery is too high The battery must be stopped charging immediately Check the communication between...

Страница 18: ...t Short circuit cause damage of battery box fuse Check whether the connection is correct and whether there is a short circuit If there is a short circuit please check the cause as soon as possible and...

Страница 19: ...weight 46 2kg Installation method Rack mounting Cycle times 80 DOD 25 4000 Charge temperature range 0 55 Discharge temperature range 20 55 communication interface CAN2 0 LINK Modbus RS485 Battery pro...

Страница 20: ...LB51100 Installation and User Manual 20 Shenzhen Olipower Energy Automation Technology Ltd Appendix 2 Product size table Product model Outline dimension LB51100...

Отзывы: