LB51100 Installation and User Manual
11
Shenzhen Olipower Energy & Automation Technology., Ltd
output is normal. Do the next operation if there is no problem.
Step 3: Turn off the battery, then connect the communication line and power cable (connect the way to refer to
the 5.4.2.2 schematic diagram), set the DIP switch correctly, confirm the connection is correct, then turn on the
battery.
5.4.2.2
Schematic diagram of single battery box and inverter connection
Attention: The drawing is for reference only, please take the material as the standard.
It is an Australia installation standard requirement AS/NZS 5139 that an overcurrent protection and isolation device that
operates both positive and negative conductors is required between battery and inverter and also between parallel batteries.
Step
1 Connect the grounding cable to the grounding port.
Step 2 Connect the power cables to the B+ and B- tightly using screwdriver.
Step 3 Plug the CAN cable into the CAN A or CAN B port, and then connect to Inverter. Shown as following:
A single battery box through the CAN communication connection inverter when the DIP switch is defined as follows: