Содержание LB51100

Страница 1: ...LB51100 Installation and User Manual 1 Shenzhen Olipower Energy Automation Technology Ltd LB51100 Installation and User Manual Version V1 0...

Страница 2: ...Introduction 6 4 2 Identifying The Product 6 4 3 Maintenance and Replacement 6 5 System Installation 7 5 1 Installation notice 7 5 2 Package information and system configuration list 7 5 2 1 Parts li...

Страница 3: ...Battery box activate and shutdown 14 6 1 Panel buttons and LEDs meaning 14 6 2 The operation steps of the battery box works alone 14 6 2 1 Start battery box 14 6 2 2 Shut down battery box 14 6 2 3 Lo...

Страница 4: ...Shenzhen Olipower Energy Automation Technology Ltd Due to product upgrades or other reasons this document will make appropriate adjustments Unless otherwise agreed this document is intended to be used...

Страница 5: ...s Manual This is the Manual for the low voltage 48V residential rack battery products User of this device or installer must refer to the installation guidance to installation and using correctly 2 2 U...

Страница 6: ...following precautions is not fully understood or has any problems please contact the customer service officer for assistance The safety part may not include all the regulations in your area The use of...

Страница 7: ...ill the regulations and legal enquiry The user has the responsibility and obligation to send it to the designated organization for recycling and disposal 5 System Installation 5 1 Installation notice...

Страница 8: ...ed in cartons and the components assort with the battery case When you confirm the good s please read the configuration list carefully to make sure that the battery box and kit are intact 5 2 1 Parts...

Страница 9: ...e to side along the wall until the mounting card on the battery box is placed in the proper position of the rack mounting position Information Rack mounted installation is suggested that the external...

Страница 10: ...as a parallel battery B B Battery negative The two negative are the same one of which can be used as a parallel battery B Attention B interface RJ45 port corresponding to the CAN bus pin definition R...

Страница 11: ...drawing is for reference only please take the material as the standard It is an Australia installation standard requirement AS NZS 5139 that an overcurrent protection and isolation device that operat...

Страница 12: ...tch after the need to restart the battery box restart the settings will take effect Single battery box through the LINK communication connection to the inverter when the address DIP switch defined as...

Страница 13: ...1 and slave battery box 2 if have slave battery box 2 Step 4 After the battery is completed in parallel it is suggested that you wait a few minutes to connect the inverter later 5 4 3 2 The connection...

Страница 14: ...the DIP switch is defined as follows CAUTION Set the DIP switch after the need to restart the battery box restart the settings will take effect Three battery boxes in parallel when the DIP switch is...

Страница 15: ...FF Turn on or off button Control battery box on or off RUN Running indicator light green When the battery box is running normally it always bright LOW BAT Low battery indicator yellow When the battery...

Страница 16: ...off run LED no longer flashing just on after 90S means the battery into the normal charging mode the battery is not detected charging after 90S the fault red LED will flashing the battery cannot be r...

Страница 17: ...attery box and the inverter is normal When the battery box is running fault indicator lights up The battery is too high The battery must be stopped charging immediately Check the communication between...

Страница 18: ...t Short circuit cause damage of battery box fuse Check whether the connection is correct and whether there is a short circuit If there is a short circuit please check the cause as soon as possible and...

Страница 19: ...weight 46 2kg Installation method Rack mounting Cycle times 80 DOD 25 4000 Charge temperature range 0 55 Discharge temperature range 20 55 communication interface CAN2 0 LINK Modbus RS485 Battery pro...

Страница 20: ...LB51100 Installation and User Manual 20 Shenzhen Olipower Energy Automation Technology Ltd Appendix 2 Product size table Product model Outline dimension LB51100...