Assembly of the front stands
Carry out the process on both sides.
NOTICE
The stands must be pre-drilled.
1. Place and screw the stands to the bottom of the
fabric tank with the longitudinal boards (2x on
each side).
2. Screw the stands to the foot profile on the
inside (2x on each side).
No. 9 (2x) - 5x70 (4x)
5x40 (4x)
8 Structure base frame
21
Installation manual
Содержание Flexilo
Страница 1: ...Installation manual Pellet Outside Storage ENGLISH PE729EN...
Страница 15: ...Check the completeness of the delivery before starting assembly 5 Parts list 15 Installation manual...
Страница 31: ......
Страница 32: ......