Assembly of the lower longitudinal and cross boards
Carry out the process on both sides.
NOTICE
The longitudinal and cross boards must be pre-drilled.
1. Place and screw the longitudinal board to the
underside of the fabric tank with the spacer
boards (4x each side).
2. Place and screw the cross board to the under-
side of the fabric tank with the spacer boards (8x).
No. 10 (2x) - 5x70 (4x)
No. 11 (1x) - 5x70 (8x)
20
8 Structure base frame
Installation manual
Содержание Flexilo
Страница 1: ...Installation manual Pellet Outside Storage ENGLISH PE729EN...
Страница 15: ...Check the completeness of the delivery before starting assembly 5 Parts list 15 Installation manual...
Страница 31: ......
Страница 32: ......