6
Structure base plate
Align the 3 foot profiles that the outer edge of the sheets match the outer edges of
the panels.
Make sure that the surface is horizontal!
NOTICE
The base plates must be pre-drilled and then screwed horizontally. Then clean the
base plates.
1. Place the foot profiles on the exposed aggregate concrete slabs and then screw the base plates
together (make sure they are perpendicular).
8x
32x
No. 1 (2x) + No. 2 (1x) + No. 5 (1x) - 5x40 (8x)
No. 5 (4x) - 5x40 (32x)
Dimensions mounting screws
2. Screw the side foot profiles to the base plates.
A: Front foot profile | B: Rear foot profile
50
850
1380
170
480
1360
1260
1800
1700
700
380
920
820
B
A
6x
Specifications in mm
No. 3 (1x) + No. 4 (1x) - 5x40 (6x) +
Ø
M5
16
6 Structure base plate
Installation manual
Содержание Flexilo
Страница 1: ...Installation manual Pellet Outside Storage ENGLISH PE729EN...
Страница 15: ...Check the completeness of the delivery before starting assembly 5 Parts list 15 Installation manual...
Страница 31: ......
Страница 32: ......