Page: 47
Service Guide OL600e/610e/610ePS
Chapter 3 Parts Replacement
3.3.13 Fusing Unit Assy
(1) Remove the upper cover (see 3.3.1).
(2) Remove the stacker cover assy (see 3.3.10).
(3) Remove four screws 1 and remove the fusing unit 2.
Caution:
Fusing unit assy may be hot. Use care when handling.
Notes:
When installing or removing the fusing unit assy, tighten or loosen the screws while holding the
fusing unit down with your hand. When reinstalling screws 1 , be sure to direct the screws into the
pre-existing hole to avoid damaging the threads. Do not apply excessive torque when tightening the
screws 1; if these screws are stripped, the entire lower unit assembly must be replaced. • When
reinstalling the fuser, insert the left side first, then lower the right side into place.
Содержание OL600e
Страница 7: ...Table of Contents Page Wrong Part Number Bill Healey OKI_ELECTRIC US 02 22 96 149 ...
Страница 22: ...Figure 2 1 OL600e Block Diagram ...
Страница 24: ...Page 12 Service Guide OL600e 610e 610ePS Chapter 2 Operation Description ...
Страница 25: ...Figure 2 2 OL610e Block Diagram ...
Страница 27: ...Page 13 Service Guide OL600e 610e 610ePS Chapter 2 Operation Description ...
Страница 28: ...Figure 2 3 OL610e PS Block Diagram ...
Страница 126: ...Page 70 Service Guide OL600e 610e 610ePS Chapter 6 Troubleshooting ...
Страница 128: ...Page 71 Service Guide OL600e 610e 610ePS Chapter 6 Troubleshooting ...
Страница 134: ...Partner Exchange BPX for any updates to this material http bpx okidata com ...
Страница 135: ...Page 75 Service Guide OL600e 610e 610ePS Chapter 6 Troubleshooting JAM error 2 2 Paper feed jam ...
Страница 150: ...Page 88 Service Guide OL600e 610e 610ePS Chapter 6 Troubleshooting 8 White vertical belts or streaks ...
Страница 151: ...Figure 6 4 ...
Страница 167: ...Page 103 Service Guide OL600e 610e 610ePS Chapter 7 Wiring Diagrams 7 3 Resistance Check ...
Страница 177: ... Connector pin arrangement 4 Signal Level LOW 0 V to 0 8 V HIGH 2 4 V to 5 0 V 5 Interface Circuit a Receiving Circuit ...