Installing temperature sensor
D055288 ver. 1
1
Temperature sensor
4
Butterfly valve
2
FGR pipe (*)
5
Burner
3
Sleeve (*)
A
Min. 7.87 in
* not included in delivery
3.10 Electrical connections
Electrical installation may be carried out by authorized and trained
personnel only.
Connect the burner according to the electrical diagrams delivered with burner. Follow
general and local standards and regulations as well as requirements set for electrical
connections for electrical equipment.
Configure the burner installation with a switch that allows it to be disconnected from the
supply mains. Grounding must be in order before commissioning burner.
See the electrical diagram for maximum cable lengths.
Burners with an integrated control system have separate power supply connections
for both the burner’s motor and its control circuit. The supply for the control circuit
needs to be connected directly to the burner wiring base. Motor outputs require two
cable connections: the burner’s control circuit needs to be wired to the motor output’s
30 (114)
M4248 2316EN
Содержание GP-350
Страница 2: ......
Страница 16: ...Block diagram of contact links Block diagram ver 7 14 114 M4248 2316EN...
Страница 91: ...5 6 Time sequence diagram gas use 7550f64e 0515 G ver 4 M4248 2316EN 89 114...
Страница 92: ...7550f57e 0515 Gp1 ver 6 90 114 M4248 2316EN...
Страница 117: ......