2 Installation
2.1 Installation site
Site planning and selection
● Install the unit and the associated equipment in a warm, dry place.
● The installation site’s ambient temperature must be 5...+40 °C (non-
condensing).
● No condensate should accumulate onto the unit’s components from ambient air
(non-condensing atmosphere).
● The air at the installation site should be free of harmful quantities of dust or other
substances that may influence the heat pump’s performance, durability, or safety.
Unit base and leveling feet
Place the unit on a stable, steady base that can carry its entire weight. Mount the unit
securely in a vertical position onto its own leveling feet. Level the machine using the
machine’s leveling feet.
Maintenance and access clearance
Install shut-off valves that allow the unit to be isolated from the brine circuit, heating
circuit, and the domestic water system.
Leave a sufficient clearance on all sides or ensure that the heat pump or that the
compressor unit can be detached. Once detached, the compressor unit can be moved
to a location that has enough space for servicing.
● Leave at least 80 cm of space in front of the unit.
● Leave at least 2 cm of space between the unit and any surrounding walls.
Access clearance ver. 1
Pos.
Item
HP
Heat pump
A
Cupboard, appliance, or
other object
M8006 2314EN
13 (59)