![OHM CORA Series Скачать руководство пользователя страница 17](http://html1.mh-extra.com/html/ohm/cora-series/cora-series_manual_3536012017.webp)
FRONT LINKS
REAR LINKS
GROUNDSTACK
SPLAY LINK
GROUNDSTACK
FRONT LINK
STORAGE
LOCK
6°
4°
2°
0°
- 2°
- 4°
- 6°
C-AF CORA ARRAY FRAM
E - Weight 27 kg
Engineered and manufacture
d in the UK
STORAGE
FRONT LINKS
REAR LINKS
GROUNDSTACK
SPLAY LINK
GROUNDSTACK
FRONT LINK
STORAGE
LOCK
6°
4°
2°
0°
- 2°
- 4°
- 6°
C-AF CORA ARRAY FRAME -
Weight 27 kg
Engineered and manufactured in the UK
STORAGE
FRONT LINKS
REAR LINKS
GROUNDSTACK
SPLAY LINK
GROUNDSTACK
FRONT LINK
STORAGE
LOCK
6°
4°
2°
0°
- 2°
- 4°
- 6°
C-AF CORA ARRAY FRAME -
Weight 27 kg
Engineered and manufactured i
n the UK
STORAGE
6°
4°
2°
0°
- 2°
- 4°
- 6°
Manchester - England
Version 7.0 01/02/2019
17
Once positioned in to the correct
hole as predicted via the pro-A-sync
software lock into place using pin B
Raise the array ready
to take the next
prepared cabinet.
Place cabinet below.
Remove pin C from top cabinet,
lower the frame until the front top
links of the lower cabinet are able
to slide in to position on the higher
cabinet.
Push the front top link in to the slot on
the bottom of the higher cabinet until
the holes line up.
With the holes lined up lock in into
place using pin C from the top cabinet.
If not already done, remove
pin B from rear splay link.
Using thumb hole on rear splay link
rotate upwards and position on
the rear splay link holes on the top
cabinet.
Once positioned in to the correct
hole as predicted via the pro-A-sync
software lock into place using pin B
Continue to connect
boxes following the
same procedure until the
required amount of array
has been added.
5
6
7
9
12
10
11
8