CHAPTER 3 - MAINTENANCE / REPAIR PROCEDURES
Ohaus Corporation www.ohaus.com
18
Pioneer PJX Series Service Manual
3.4
REPLACING THE LOAD CELL PCB
The Loadcell PCB may need to be replaced because it is physically broken or displays an error
code.
Note: No Load cell PCB replacement for Pioneer PJX 5 place and Strain Gauge load cell, due to the
technical soldering process.
Disassembly for Nova Load cell PCB:
1. Open the balance – see Section 3.2.
2. Take out the load cell – see Section 3.3.
3. Remove three cables and one screw, which fix the cable.
4. Remove two screws
5. Reverse the disassembly procedure to assemble the Load cell PCB.
Disassembly for Loong Load cell PCB:
1. Open the balance – see Section 3.2.
2. Take out the load cell – see Section 3.3.
3. Remove three cables then two screws.
Содержание Pioneer PJX Series
Страница 1: ...Pioneer PJX Series Balances Service Manual ...
Страница 2: ......
Страница 6: ......
Страница 54: ......