![OHAUS MB45 Скачать руководство пользователя страница 46](http://html1.mh-extra.com/html/ohaus/mb45/mb45_instruction-manual_726586046.webp)
4 6
Operating your Moisture Analyzer - Section 6
Close the cover.
START/STOP
Starting the test
Press the
Start/Stop
button. The Moisture Analyzer starts the drying and
measurement process. All of the settings made in the Test Menu are now
put into effect.
TEST ID:
071000 B
TEMP / TIME: 130°C / AFREE.
INITIAL WT:
1.094 G
130°C
1:10
2.14%
MOISTURE
A running real time display illustrates the drying process which includes
the test ID, set temperature, type of switch off, initial weight, current tem-
perature in the chamber, actual elapsed time of the test, and moisture
content.
Removing the sample
When the test measurement is completed, you may remove the sample
from the instrument by opening the cover, and carefully lift the pan
handler from the chamber.
Stopping the test
Press the
Start/Stop
button. The Moisture Analyzer stops the drying and
measurement process.
Interrupting the test (manual switchoff only)
During the measurement process, the test can be interrupted for a very
short period of time if a sample has to be stirred for example. To do this ,
simply lift the cover, stir the sample and close the cover. The test will
resume. In the PRINT MODE, the time the cover is open will be printed.
Remember, use caution as components are hot.
All manuals and user guides at all-guides.com
all-guides.com
Содержание MB45
Страница 70: ...All manuals and user guides at all guides com ...