background image

Installation & Operation Manual                                                                                               Merlin 1000V 

 

 

 

 Rev: 02    05-22

 

5

 

 

Circuit Board Overview 

 

Damage to PCBs when creating cable entry points may void any warranty! 

 

Any damage attempting to remove the circuit board may void any warranty! 
 

 

 

Wiring: Power Input 

 

100-240V~ Mains Power should be supplied to the [POWER / LINE IN]

 

terminal and fused at 3A. 

 
On connecting the mains supply to the panel, the red power LED indicator will light up 

 this is located 

on the front cover (OGS Logo). 

 

Wiring: Gas Solenoid Valve 

 

Pressure sensors should be screwed to the downstream port of the valve. 

 

100-240VAC electrical power supplied from the [VALVE OUT] connector using a 3-core cable can be 
connected to a gas solenoid valve which can shut the gas supply on alarm status. 
 
Refer to your valve manual for more information and wiring! 
 
 

 

Содержание Merlin 1000V

Страница 1: ...on Controller with Ventilation Interlocking Installation Operation Maintenance Please read this manual carefully and retain for future use For specific requirements that may deviate from the informati...

Страница 2: ...r CO2 Monitor 6 Fan Switches 7 PD Switches Current Monitors 7 12 VDC 7 Switch Settings Auto RST Panel Auto Reset 7 Switch Settings Pressure Gas Pressure Threshold Configuration 7 Switch Settings EM SE...

Страница 3: ...nty extends to the original consumer purchaser of the product only Warranty disclaimers Any implied warranties arising out of this sale including but not limited to the implied warranties of descripti...

Страница 4: ...hut off the gas solenoid valve at the end of a specific time this time can be adjusted to 2 5 8 hours or can be overridden if required Mounting Cabling If mounting direct to wall ensure the wall surfa...

Страница 5: ...LINE IN terminal and fused at 3A On connecting the mains supply to the panel the red power LED indicator will light up this is located on the front cover OGS Logo Wiring Gas Solenoid Valve Pressure s...

Страница 6: ...rewed into the downstream port of the gas solenoid valve Connect the pressure sensor as shown The sensor will monitor the gas supply pressure and if pressure drops below 0 5 or 1 2Kpa the gas valve wi...

Страница 7: ...g There is a switch located on the circuit board labelled AUTO RST OFF When power is restored after the power cut loss the panel must be restarted manually Default ON This will instruct the system to...

Страница 8: ...meout Period Upon timeout the gas supply will be turned off There are two dipswitches Time 1 Time 2 The system has an auto shut down feature after a selected time These can be configured to select the...

Страница 9: ...NOT operate any appliances Test Fail Under normal working conditions this LED is off When the panel detects a gas leak on start up the LED will illuminate AMBER Gas valve will remain closed OFF OK ON...

Страница 10: ...e chlorine hydrogen chloride alkali metals basic or acidic compounds silicones tetraethyl lead halogens and halogenated compounds Keep your panel in good working order follow these basic principles R...

Страница 11: ...Overvoltage Category II Pollution Degree 2 Equipment Class 2 Environmental Ingress Protection Not Formally Evaluated Operating 10 50 C 14 122 F 30 80 RH non condensing Storage 25 50 C 13 122F up to 9...

Страница 12: ...ensure the equipment performs as intended and is free from any unforeseen damage caused by transit installation Every effort is made to ensure the accuracy of this document however OGS can assume no r...

Отзывы: