background image

OFITE, 11302 Steeplecrest Dr., Houston, TX 77065 USA / Tel: 832-320-7300 / Fax: 713-880-9886 / www.ofite.com

2

The problems of gas migration after cementing operations have been well 

documented. The costs associated with these problems, as well as stricter 

environmental regulations, have forced gas well operators to look for 

methods to minimize gas migration.

The OFITE Gas Migration Tester helps predict and overcome the potential 

for gas migration after cementing. This unit evaluates both the potential and 

severity of gas migration at downhole conditions with the recommended 

slurry. This allows for the design of the most economical and reliable cement 

slurry for a particular well.

A test cell is filled with a cement slurry and placed into a heating jacket. The 

test cell is fitted with a piston above the slurry and a screen below. A back 

pressure regulator below the test cell applies back flow pressure. Hydrostatic 

pressure is applied to the piston and nitrogen/gas pressure is applied through 

the piston tubing and onto the cement slurry. As the slurry hardens, if the 

cement is sufficiently permeable, the nitrogen pressure will force the gas 

through the back pressure regulator to be collected and measured. Both 

filtrate and gas volume are collected.

Introduction

Description

Inlet Cap

Cell

Piston

Screen

Cement

Cement

N

2

 Gas - 500 PSI 

(3,447.5 kPa)

To Computer
Pressure Transducer

Hydrostatic / Overburden 

Pressure 1,000 PSI

(6,895 kPa)

To Computer
Pore Pressure Transducer

Back Pressure

300 PSI (2,068.5 kPa)

Back Pressure Regulator

Filtrate

Содержание 120-57

Страница 1: ...120 57 115 Volt 120 57 1 230 Volt Instruction Manual Updated 3 25 2020 Ver 3 OFI Testing Equipment Inc 11302 Steeplecrest Dr Houston Texas 77065 U S A Tele 832 320 7300 Fax 713 880 9886 www ofite com...

Страница 2: ...tion 2 Specifications 3 Components 4 Installation 6 Setup 7 Software 9 Setup 9 Operation 10 Calibration 11 Assembly 14 Setup 14 Test Cell 15 Installing the Test Cell 20 Testing 22 Starting the Test 22...

Страница 3: ...lar well A test cell is filled with a cement slurry and placed into a heating jacket The test cell is fitted with a piston above the slurry and a screen below A back pressure regulator below the test...

Страница 4: ...Fax 713 880 9886 www ofite com 3 Specifications Maximum Temperature 400 F 204 4 C Maximum Pressure 2 000 PSI 13 790 kPa Crated Size 43 36 48 inches 109 2 91 4 121 9 cm Crated Weight 469 lb 212 7 kg V...

Страница 5: ...en 325 Mesh with 60 Mesh Backup Optional 120 57 SP Spare Parts for 120 57 120 57 01 Screen 325 Mesh Qty 20 120 57 02 Screen 60 Mesh Qty 10 120 57 03 Piston Seal Qty 6 120 57 04 O ring for Screen Qty 6...

Страница 6: ...ement Transducer Test Cell Assembly Pressure Transducer Thermocouple Pressure Relief Valve Backflow Pressure Nitrogen Gas Pressure Hydrostatic Pressure Thermocouple Heating Jacket Valve Stem Top Filtr...

Страница 7: ...he AC power cord into an appropriate outlet 3 Connect a nitrogen air supply at least 1 000 PSI to the back of the unit via the top female NPT port 4 The Coolant In and Coolant Out ports on the back co...

Страница 8: ...C to boot 4 Connect the back pressure regulator to the Backflow Pressure port on the unit cabinet via the quick connect hose 5 Attach the tube to the back pressure regulator and feed it through the ho...

Страница 9: ...receiver From there it is emptied into the filtrate flask The filtrate will then be weighed by the load stand while the gas will be pushed into the water collection flask In the water collection flask...

Страница 10: ...file is updated Pressure Unit Choose either PSI or MPa Temp Unit Choose either Deg F or Deg C Distance Unit Choose either Millimeter or Inches Archive Path The location of the data file Print to Prin...

Страница 11: ...is important to prepare the software for testing 1 Open the software by double clicking the icon on the desktop 2 From the Utilities menu select Load Sample Infos Give the test a name The name will pr...

Страница 12: ...Stores the calibration values in memory 2 Choose the device to be calibrated from the Variable drop down list a Sample Temp and Cell Temp i Before calibrating either temperature set the temperature un...

Страница 13: ...re calibrating the piston location set the Distance Units to mm Refer to page 9 for instructions ii Turn the LVDT so that the transducer rod is touching the heating jacket iii Lower the LVDT all the w...

Страница 14: ...tabilized click the High button vi Click the Store Cal button to save the calibration data e Pore Pressure i Release all pressure from the system ii Enter 0 in the Value Low field Once the Raw Value h...

Страница 15: ...ace inside with high temperature grease Replace the transducer then open the relief valve and fill the remaining space Close the relief valve 2 Remove the thermocouple and inject the grease directly i...

Страница 16: ...Place the screens inside the bottom of the piston over the o ring The screen with the tighter mesh goes on the outside c Screw the brass retainer ring in place securing the screen and o ring Do not ov...

Страница 17: ...the piston rod Leave about space between the connector and the end of the rod O ring Autoclave F250C Connector Bottom Autoclave F250C Connector Top Piston Rod Inlet Cap Seal Plug Locking Ring 6 Place...

Страница 18: ...o the groove inside the top of the test cell 10 Press the spacer down around the top of the piston Then slide the piston assembly into the top of the test cell The spacer will stay at the top while th...

Страница 19: ...out of the hydrostatic pressure port Cap both the hydrostatic port on inlet cap and the nitrogen port on the piston rod to prevent oil from leaking out 13 Turn the cell over and pour in the cement sl...

Страница 20: ...bottom of the test cell 15 Place the screen on top of the o ring with the flat side facing down 16 Place another o ring on top of the screen 17 Screw the bottom cell cap into the cell and tighten comp...

Страница 21: ...e side of the cell slide into the notch on the side of the heating jacket 2 Plug the sample thermocouple and pressure transducer into the appropriate ports on the unit cabinet to the left of the heati...

Страница 22: ...ermocouple into the hole on the top edge of the test cell 6 Attach the back pressure regulator to the valve stem via the quick connect port 7 In order to get accurate readings from the load cell it is...

Страница 23: ...g below ambient set the temperature in the software to 0 turn on the chiller and open the Cooling valve The cell temperature must be controlled on the chiller not the software 5 Set the back flow pres...

Страница 24: ...uitable container underneath the Top Filtrate drain Slowly open the Top Filtrate valve 9 Slowly open all of the bleed valves on the right hand side of the control panel and place the Air Supply valve...

Страница 25: ...ct the unit to the Back Flow Pressure via the quick connect hose Attach the hose to the same port that was previously connected to the valve stem on the test cell c Close the Back Flow Pressure bleed...

Страница 26: ...tware 16 Under Directories choose the year and month of the test you want to open For example a test run in January of 2010 will be labeled as 2010 Month01 17 Under tests choose the test you want to o...

Страница 27: ...l so that it sits on top of the cement If the piston does not extend above the top of the cell try the next longest piston 4 Carefully hit the piston with a hammer The cement plug may fall out of the...

Страница 28: ...1 Cell Cap Inlet 4 170 13 3 O ring for Test Cell Qty 3 5 120 57 05 Rod Seal 6 120 57 16 Seal Plug 7 170 77 O ring 8 170 72 Spacer 9 120 57 14 Piston Seal Screw Ring 10 120 57 03 Seal Ring 11 120 910 0...

Страница 29: ...ny losses or damages that occur as a result of Improper installation or maintenance of the products Misuse Neglect Adjustment by non authorized sources Improper environment Excessive or inadequate hea...

Отзывы: