background image

 8 
 

4.

 

Start-up / Shut-down

 

Before start-up:

 

Before start-up of a machine of the OERTZEN Mobile series, the following 
instructions to be followed: 
 
 
 
 

  Operating manual of machine and motor to be read thoroughly and 

considered. 

  Check correct oil levels of high pressure pump (dip stick (8)), reduction 

gear and motor.  Exclusively oil qualities approved by OERTZEN  to be 
used. High pressure pump/reduction gear: OERTZEN OSP pump oil; 
engine: OERTZEN OSM motor oil. 

  Unit only to be run with absolutely clean water. Flush the water hose 

thoroughly  before connection. Depending on water quality, water filter 
to be inspected in regular intervals. 

  Unit only to be run in horizontal position (+/- 5 %). 

  During starting from cold, warm up the engine for several minutes, so 

extending its lifetime. After work “slow down” the motor. 

  In order to ensure readiness of use and trouble free operation, carry out 

the following control checks before, during and after work: 

 

  General condition of the unit (screwed connections, protection caps, 

etc.). 

 Electrical 

connections. 

 Control 

lamps. 

  Pump and connections to be checked for leaks. 

  High pressure hoses and other hoses to be checked for cracks/ 

damages. 

  Water supply, water strainer 

  Air supply, air intake not to be blocked. 

  Fill up all consumables. 

  Check for abnormal noise. 

 

 In case of malfunctions immediately stop the machine, eliminate 

malfunctions as described in chapter „Trouble Shooting“, respectively 
call qualified service personnel. 

 
 
 

 

 

Содержание M 320

Страница 1: ...To be read carefully before start up Operation Manual M 320 von Oertzen GmbH Ferdinand Harten Str 10 22949 Ammersbek Tel 49 40 604110 Fax 49 40 6041149 www oertzen gmbh de info oertzen gmbh de 03 08 ...

Страница 2: ...fety Instructions pages 4 5 3 Configuration Illustration pages 6 7 4 Start up Operation Shut down pages 8 11 5 Maintenance and Care pages 12 14 6 Technical Data page 15 7 Trouble Shooting pages 16 8 Declaration of Conformity page 17 M320 03 08 AG ...

Страница 3: ...raining courses in order to enable the operating personnel to run the machine in accordance with the instructions laid down in this manual to carry out all necessary maintenance work described herein and to eliminate minor repair work This warning symbol appears in this operating manual at all opera ting and safety instructions dealing with the dangers for personal entirety and life DIN 4844 This ...

Страница 4: ...s soon as the max operating pressure is exceeded by 10 The unloader valve is workshop adjusted and sealed The adjustment must not be changed Unsuitable or defective high pressure hoses very often cause accidents during operation of high pressure cleaners Therefore check the hoses for damages before any start up Defective high pressure hoses immediately to be replaced by original OERTZEN equipment ...

Страница 5: ...air maintenance work ZH 1 95 Extension cables to have a diameter according to VDE regulations Extension cables on reels to be reeled off completely during operation in order to avoid overheating of the cable reel The unit is equipped with a brake This brake to be fixed when working in steep areas During loading suitable lifting eyes to be foreseen Balanced load to be ensured Exhaust gas out of com...

Страница 6: ... operating pressure is exceeded by more than 10 and directs the water which cannot be taken by the nozzle back into the suction line of the high pressure pump In parallel it allows to continuously adjust working pressure and water flow By opening the rotary handle of the double lance the working pressure can be adapted to the requirements at the cleaning object The machine is equipped with a safet...

Страница 7: ...7 ...

Страница 8: ...ntervals Unit only to be run in horizontal position 5 During starting from cold warm up the engine for several minutes so extending its lifetime After work slow down the motor In order to ensure readiness of use and trouble free operation carry out the following control checks before during and after work General condition of the unit screwed connections protection caps etc Electrical connections ...

Страница 9: ... and spray pistol Insufficient water supply will cause severe damage on the pump cavitation High Pressure Connection High pressure hose to be connected to the unit s outlet 2 by means of the screw joint hand tight without tools Fuel Supply Fuel tank 3 to be filled Petrol and petrol fumes are highly flammable and explosive Fire or explosion will lead to severe injuries or death Fuel never to be han...

Страница 10: ...valve Counter clockwise continuous reduction of pressure and water volume to minimum capacity Clockwise continuous increase of pressure and water volume up to maximum capacity Detergent Injection Only if special injector kit is installed The injector is activated when spray wand is fully opened The injection rate is 10 of the water volume To achieve a lower injection rate detergent to be diluted e...

Страница 11: ...high pressure hose Exclusively original OERTZEN hoses to be used otherwise warranty and product liability will be nil and void Unit to be stored in a dry frost proof place Drain pump completely for extended shut down periods Particularly note In case of malfunctions stop the machine immediately eliminate malfunction according to chapter Trouble Shooting respectively call qualified service personne...

Страница 12: ...OERTZEN voids all warranty Reduction Gear First oil change after 50 operating hours all further oil changes every 500 operating hours min once a year Correct oil level to be checked every day Exclusively OSP pump oil to be used Use of oil qualities not approved by OERTZEN voids all warranty High Pressure Pump First oil change after 50 operating hours all further oil changes every 500 operating hou...

Страница 13: ...e to be protected as follows 2 l of a 1 1 water frost protection liquid to be mixed in a clean vessel water connecting hose to be dipped into vessel pump to be started Spray pistol to be opened and frost protection liquid to be returned into the vessel so circulating the liquid through the system Spray pistol to be opened and closed several times in order to also fill the unloader valve with the l...

Страница 14: ...Working pressure adjustable 310 bar Power 22 PS 17 kW Fuel consumption at full load 7 7 l h Tank volume 20 l Oil shortage cut out standard Starting device battery start Dimensions L x W x H mm 880 x 750 x 690 mm Weight net 151 kg Nozzle Part No 10 742 333 Nozzle designation HIP 2333 Recoil 84 N Noise level 7 m 81 dB A ...

Страница 15: ...hoke open Poor water supply Fill up oil up to max mark Release unloader valve Charge battery Put switch into position On Open petrol cock Close choke Check filter ensure sufficient water supply Pump pressure high Nozzle clogged Clean remove and nozzle Operating pressure not achieved varies Air in unit Insufficient water supply Nozzle worn Incorrect nozzle Nozzle clogged Water strainer blocked Unlo...

Страница 16: ...16 ...

Отзывы: