OTR 700 User's Guide Rev02 11/2016
36
Chapter 9 Project Management
Modify Properties
To modify the properties, have the project to modified highlighted. Press menu, highlight edit/properties
and press select. The project properties will be displayed, use the up/down buttons to highlight the field to
be changed, use the on-screen QWERTY keyboard to make the change and touch save. Continue with the
changes needed, when compete highlight close and press select.
Temporary Modification of Parameters
Test parameters may be temporarily changed by selecting new settings, such as wavelength, average time,
pulse width, and range directly on the main OTDR screen with the touch screen capabilities or open the
parameter settings screen, set the new parameter and save. All subsequent test will use the new settings until
the original settings are returned or the folder is reopened resetting the project parameters. To make temporary
changes to event sensitivity or thresholds, open the parameters settings page.
Exit Project Management
To exit the project management, press menu, use the left or right buttons to highlight the file tab, press select
or the down button to open the drop down menu. Use the down button to highlight Exit and press select.
Rename a Project
To rename a project, have the project to be renamed highlighted, press menu, to open the project management
menu. Use the left and right buttons to highlight edit tab and press select or the down button to open the drop-
down menu. Use the down button to highlight rename and press select. The project name will be displayed
with the on-screen QWERTY keyboard. Use the keyboard to rename the project and touch save.