![Ochsner OTE 3 Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/ochsner/ote-3/ote-3_operating-instructions-manual_723515021.webp)
BA_OTE 3+4_Endkunde_EN_V03_20170726.docx
Page 21 of 52
6
Hot water circuit
Hot water heating has priority over heating/cooling. During hot water heating - depend-
ing on the type of system/control setting - the heating circuit pumps are switched off.
6.1
Operation selection
The following modes of operation can be set:
Operation selection
Description
0: No charging
No hot water charging
the frost protection temperature
for hot water (10°C) is active.
1: Automatic
The hot water charging takes place via the time program for
hot water/anti-legionella function
2: Normal daytime tem-
perature
Hot water charging always takes place according to the
standard temperature (no consideration of the time pro-
gram).
Settings procedure:
1.
Press
the adjustment knob in the main
display > the main menu appears
2.
Select the Hot Water Circuit by
turning
the
adjustment knob and confirm by
pressing
the knob. > the temperature image for the
hot water circuit appears.
3.
In hot water circuit temperature image,
select the hot water circuit menu by
press-
ing
the adjustment knob.
4.
By
turning
the adjustment knob, select
Operation mode
in the hot water menu
and confirm this by
pressing
the knob.
5.
Change/adjust the operation selection by
turning
the adjustment knob and store this
by
pressing
.
05-050
HOT WATER
Operation mode
domestic hot water
1: Automatic
ESC
HOT WATER
Operation mode
Operational data
Settings
Relay test
ESC
ENTER
ESC
MENU
HOT WATER
HEAT PUMP
ESC
ENTER
Main menu
HEATING CIRCUIT 1
HEATING CIRCUIT 2
HOT WATER
Heating m ode
OCHSNER OTE
MENU
Sa 05.08.2017
08:10
1
2
3
4
5