BA_OLW I OTE3_SW5x_EN_20160815_V2
8 / 48
5 Installation
5.1 Transport
► Be aware of the centre of gravity of the appliance
during transport. The centre of gravity is to be found
in the region of the condenser.
Lifting straps for transporting the basic appliance
can be hooked at any point way to the bottom frame
of the heat pump.
►
Protect the appliance during transport from heavy
bumps. If you have to tilt the appliance during
transport, this may only be done for a short time on
the long side. The longer the appliance is tilted, the
more the refrigerant oil is distributed in the system.
►
Wait for ca. 30 minutes before you operate the
appliance after it has been tilted.
The appliance must not be placed
on its side!
5.2 Placing and connecting the appli-
ance
NOTE:
-
Two screws are provided in the top of the
heat pump frame. These are for fixing the
cowling to the frame.
-
Two screws are provided in the bottom of the
heat pump frame, one for each side panel.
►
Unscrew the 6 fixing screws in the frame and keep
them for later use.
► Place the appliance on the prepared foundation.
►
Pay attention to the direction of the air outlet.
►
By fitting the pressure hoses supplied between the
functional unit and the heat pump, no further pres-
sure hoses must be fitted as vibration dampeners.
Air hoses are fitted to the functional module. These
are for connecting the air inlet and outlet openings
in the wall.
►
Wall conduits AWG 560H or AWG 560L are to be
used for the wall feed-through.
Installing the functional module:
Fig.6: Installing the functional module:
►
Place the functional module on to the heat
pump and fix it with two screws.
►
Stick the rating label supplied at the top front
of the right-hand side panel of the functional module so
that it is clearly visible.
Opening the functional module:
Fig.7: Opening the functional module:
►
Remove the safety screw.
►
Pull the level forward and the left hand flap opens.
►
Open the right hand flap by pulling firmly.
Содержание OLWI 9
Страница 2: ...BA_OLW I OTE3_SW5x_EN_20160815_V2 2 48...
Страница 25: ...BA_OLW I OTE3_SW5x_EN_20160815_V2 25 48 14 2 Hydraulic diagram...
Страница 26: ...BA_OLW I OTE3_SW5x_EN_20160815_V2 26 48 14 3 Electric circuit diagrams OTE...
Страница 27: ...BA_OLW I OTE3_SW5x_EN_20160815_V2 27 48...
Страница 28: ...BA_OLW I OTE3_SW5x_EN_20160815_V2 28 48...
Страница 29: ...BA_OLW I OTE3_SW5x_EN_20160815_V2 29 48 14 4 Wiring overview...
Страница 37: ...BA_OLW A I OTE3_SW5x_DE_20160510_V2 37 48 15 Declaration of Conformity...
Страница 38: ...BA_OLW I OTE3_SW5x_EN_20160815_V2 38 48...
Страница 39: ...BA_OLW A I OTE3_SW5x_DE_20160510_V2 39 48 16 ERP Data...
Страница 40: ...BA_OLW I OTE3_SW5x_EN_20160815_V2 40 48...
Страница 47: ...BA_OLW I OTE3_SW5x_EN_20160815_V2 47 48...