background image

 

BA_OLW I OTE3_SW5x_EN_20160815_V2 

20 /  48 

 

11  Maintenance 

 

11.1  Service work 

 

Accessibility  of  the  heat  pump  and  ancillary  appli-
ances  is  to  be  ensured  for  service  work  at  all 
times! 
 

The heat pump operates essentially maintenance-free. 
It must, however, be ensured that: 

the evaporator is free from leaves and twigs 
or any other foreign bodies, 

the condensation can drain off, 

the heating circuit contains enough water 

 
NOTE: 
In order to prevent additional costs, it is recommended 
to have the heat pump serviced at least once per year. 
Furthermore,  
legal  regulations  require  that  heating  appliances  be 
checked  and  serviced  regularly  by  the  user. 
OCHSNER  can,  if  desired,  offer  a  service  contract  in 
order  to  carry  out  any  necessary  leakage  tests  and 
checking of safety equipment of  
the heat pump. 
If  required,  please  contact  our  customer  service  de-
partment.which  will  test  the  functionability,  efficiency 
and safety  functions of the  machine  as  well as  check-
ing  the  control  and  regulation  equipment.  Your  ad-
vantages  of  servicing:  Correctly  carried  out  servicing 
not  only  saves  energy,  it  also  protects  the  environ-
ment.  Furthermore,  the  correct  care  of  the  heating 
system  is  a  necessary  prerequisite  in  order  to  safe-
guard  the  operational  life  of  the  heat  pump  for  many 
years. This gives the system user increased protection 
against  malfunctioning  and  ensures  guarantee  claims. 
A  
service contract provides continuity. In order to ensure 
that 
the monitoring and care of the heat pump is carried out 
at regular intervals,  
it  is  recommended  to  conclude  a  service  contract.  A 
fully  filled  out  protocol  documents  the  working  results 
and the machine's condition.  
 
The  water  pressure  in  the  heating  system  is  to  be 
monitored  by  the  system  operator  and  adjusted  if  the 
the pressure is too high or too low. 

 

The  flow  rates  in  the  heating  system  are  to  be  moni-
tored with the flow meters specified by OCHSNER. 

 

Furthermore, the specified system service intervals as 
well as the system checks must be adhered to. 

 

 
If,  during  larger  reconstruction  work  or  after  burst  pip-
ing the majority of the water in the heating system has 
to be drained off and refilled, this must be carried out in 
the  presence  of  the  OCHSNER  works  customer  ser-
vice / OCHSNER authorised partner (see Logbook)

 

If  exceptional  refilling  work  is  to  be  carried  out  (e.g. 
reconstruction  work  or  after  burst  piping),  a  current 
water test report is to be made and, if necessary, using 

this  report,  additives  must  be  used  when  refilling  the 
heating system. 

 

Note 
On  request,  OCHSNER  can  offer  a  maintenance  con-
tract.  If  required,  please  contact  our  customer  service 
department. 

 

11.2  Cleaning 

 

  

Appliance and environmental damage 

Service work, for instance checking the electrical safe-
ty, must only be carried out by a specialist electrician.  
► Protect the appliance from dust and dirt during the 
construction phase. 

 

► A moist cloth is sufficient to care for the plastic 

and metal parts.

 Do not use scouring or dissolving 

cleaning agents. 

► Check the condensate drain function once per 

month (visual control).

 Check whether water has 

accumulated under or alongside the appliance. Ob-
serve the Section "Troubleshooting". 

We recommend an annual inspection (determination of 
current  condition)  and,  if  required,  servicing  (estab-
lishment of correct condition) by a specialist installer or 
the OCHSNER Customer Service. 
 

11.3  Customer Service  

 
Should defects occur in your appliance,  
in  spite  of  the  high-quality  components  used  and  the 
diligence shown during production, please inform your 
contractual partner or the OCHSNER customer service 
with  information  on  the  serial  number  and  the  heat 
pump module under the following telephone numbers: 
 
Customer Service Austria:   

Tel.: 

 

+43 (0) 504245 

– 499 

E-Mail:

 

[email protected] 

 

Customer Service Germany:  

Tel.:

 

+49 (0) 69 256694 - 495 

E-Mail:

 

[email protected] 

 

Customer Service Switzerland:  

Tel.:

 

+41 (0) 58 32041 - 99 

E-Mail:

 

[email protected]om 

 
The serial number and the heat pump model are to be 
found  on  the  rating  label.  The  rating  label  is  on  the 
outer rear panel of the heat pump. 

Содержание OLWI 9

Страница 1: ...BA_OLW I OTE3_SW5x_EN_20160815_V2 1 48 Operating Instructions Installation Instructions OLWI Air Water Heat pump Heating hot water...

Страница 2: ...BA_OLW I OTE3_SW5x_EN_20160815_V2 2 48...

Страница 3: ...ats 16 8 2 2 Insulation 17 8 3 Mounting the cladding 17 8 4 Installing the air hoses 17 8 4 1 General 17 8 4 2 Installing the air hoses 17 8 4 3 Insulating the wall 17 9 Commissioning 18 9 1 Required...

Страница 4: ...ed to the control heat gen erator pumps safety thermostats etc Contact with the terminal strips wires connected to them or non connected wires by persons or by means of elec trically conductive materi...

Страница 5: ...ed between the sea and the place of installation 3 2 Function The heat from the outside air is extracted by means of an air heat exchanger evaporator The refrigerant vaporises and is then compressed b...

Страница 6: ...on can however lead to undesired increase in the sound level under unfavourable circumstances NOTE You can find information on the sound power level in the Technical Data Data Table section 4 2 Air du...

Страница 7: ...liance is accessible from all sides Make sure that the foundation is horizontal level firm and permanent Ensure that the appliance frame fits uniformly on the foundation Uneven ground can influence th...

Страница 8: ...Two screws are provided in the bottom of the heat pump frame one for each side panel Unscrew the 6 fixing screws in the frame and keep them for later use Place the appliance on the prepared foundation...

Страница 9: ...connection Connect the functional module to the heat pump with the pressure hoses supplied 1 Pressure hose flow 2 Pressure hose return Fig 8 Hydraulic connection functional module Check the plug conne...

Страница 10: ...ystems in conjunction with steel pipework can lead to oxygen diffusion corrosion of the steel pipework The products of such corrosion such as rust silting can be deposited on the heat pump condenser a...

Страница 11: ...p must be installed Take the constructional fac tors into consideration When using a condensate pump make sure that its rating is at least 6l min Condensate drain 1 Drain with odour trap 2 Drain hose...

Страница 12: ...e drain After laying the condensate hose make sure that the condensate is draining freely Proceed as follows Pour water onto the evaporator so that it flows into the de icing sump Ensure the maximum c...

Страница 13: ...heat pump All three phase drives compressor pumps fans MUST be connected to a CLOCKWISE field of rotation 7 1 Cable cross sections Position min cross section Connection cable 230V pumps valve motors C...

Страница 14: ...als will be transmitted between the control OTE and the Airstation A 5 pole control cable W5 5x 1 0mm is used for this This is already fitted in the functional module and only has to be connected to t...

Страница 15: ...Ochsner hot water tanks are fitted with corresponding sleeves for the installation The current electromagnetic compatibility guidelines are to be adhered to during laying The sensors are to be checke...

Страница 16: ...tape The tape is in the accessory heat insulated air hose Fig 20 Seal the appliance inside 2 Hang the foil with the pre cut holes on the hooks on the appliance Fig 21 Seal the appliance inside 3 Remo...

Страница 17: ...and air outlet sides Do not make more than four 90 bends The bend ing radius must be at least 600 mm based on the hose middle Use a sharp knife to cut the hose The wire spirals can be cut with wire c...

Страница 18: ...invoiced separate ly 9 2 Non self resetting safety thermostat At outside temperatures below 15 C the non self resetting safety thermostat can trigger the electric emergency auxiliary heater Check whet...

Страница 19: ...y devices for the compressor High pressure pressostat Start delay to avoid compressor chopping Frost protection function Start up and run down times of the fans 10 2 Running costs During the first hea...

Страница 20: ...ied system service intervals as well as the system checks must be adhered to If during larger reconstruction work or after burst pip ing the majority of the water in the heating system has to be drain...

Страница 21: ...t may only be de commissioned by an authorised specialist firm cool ing air conditioning heating The refrigerant resp brine fluid is to be evacuated removed correctly by the specialist firm and and re...

Страница 22: ...lked up Contact heating installer clean and decalcify heat exchanger Hot water temperature not reached or no longer reached Hot water heat exchanger too small Increase heat exchanger size Heat exchang...

Страница 23: ...ce sensor 116 Er 10 Outside sensor defect Replace sensor 117 Er 14 Mixer sensor defect Replace sensor 124 Er 20 TWR sensor defect Replace sensor 120 Er 22 Switch off sensors TWR TPM de fect Replace se...

Страница 24: ...c11 Safety group e22 Hot water Flow External thread G 1 1 4 A e23 Hot water Return External thread G 1 1 4 A E01 Heating flow External thread G 1 1 4 A e02 Heating return External thread G 1 1 4 A g0...

Страница 25: ...BA_OLW I OTE3_SW5x_EN_20160815_V2 25 48 14 2 Hydraulic diagram...

Страница 26: ...BA_OLW I OTE3_SW5x_EN_20160815_V2 26 48 14 3 Electric circuit diagrams OTE...

Страница 27: ...BA_OLW I OTE3_SW5x_EN_20160815_V2 27 48...

Страница 28: ...BA_OLW I OTE3_SW5x_EN_20160815_V2 28 48...

Страница 29: ...BA_OLW I OTE3_SW5x_EN_20160815_V2 29 48 14 4 Wiring overview...

Страница 30: ...or R3 Start up resistance F5 Non self resetting thermostat DAE X1 Terminal strips K1 Start up resistance relay X3 Power supply terminal strip K2 Compressor start up relay X4 Control terminal strip K5...

Страница 31: ...sor suction air PT1000 X33 5 pole plug expansion valve B7 Temperature sensor compressor inlet PT1000 X34 7 pole plug sensors B8 Temperature sensor evaporator outlet PT1000 X35 6 pole plug temperature...

Страница 32: ...9 5 1 3 7 11 15 19 Air tempearture C Power draw kW 6 7 8 9 10 11 12 13 14 15 16 17 21 19 17 15 13 11 9 7 5 3 1 1 3 5 7 9 11 13 15 17 19 21 Heating power kW 35 C 45 C 55 C 60 C Leistungskurven OLWA OL...

Страница 33: ...3 5 7 9 11 13 15 17 19 21 Heating power kW 35 C 45 C 55 C 60 C Leistungskurven OLWA OLWI 18 Air temperature C 0 1 2 3 4 5 6 21 17 13 9 5 1 3 7 11 15 19 Air temperature C COP 14 8 Performance diagram O...

Страница 34: ...Capacity kW 8 9 12 9 16 6 8 9 12 9 16 6 Total Power Consumption kW 2 2 9 5 1 2 2 9 5 1 Coefficient of Perfomance EN 14511 EN 255 4 4 4 4 4 0 4 4 4 4 4 0 Drawn Current A 3 5 6 4 9 9 3 5 6 4 9 9 Heatin...

Страница 35: ...al available external pressure differential hPa 1 0 1 0 1 0 1 0 1 0 1 0 Max available external pressure differential on suction side hPa 0 8 0 8 0 8 0 8 0 8 0 8 Construction Type Fin package material...

Страница 36: ...um portion 2 2 0 3 5 0 4 1 0 5 6 0 6 0 5 7 5 0 8 0 5 9 1 5 10 0 5 11 3 5 12 0 5 13 3 0 14 0 5 15 0 5 16 0 5 17 2 0 18 0 5 19 1 5 20 0 5 21 0 5 22 0 5 23 1 5 25 1 5 25 0 5 Table 5 Voltage quality in th...

Страница 37: ...BA_OLW A I OTE3_SW5x_DE_20160510_V2 37 48 15 Declaration of Conformity...

Страница 38: ...BA_OLW I OTE3_SW5x_EN_20160815_V2 38 48...

Страница 39: ...BA_OLW A I OTE3_SW5x_DE_20160510_V2 39 48 16 ERP Data...

Страница 40: ...BA_OLW I OTE3_SW5x_EN_20160815_V2 40 48...

Страница 41: ...umps CO d 1 5 T 15 C if TO 20 C T 15 C if TO 20 C Bivalent temperature Tbiv 5 C or air to water heat pumps TO 10 C Operation limit temperature ower input compressor off 0 Heating water operating limit...

Страница 42: ...n as otherwise any war ranty claims and or claims for damages and or claims for avoidance on account of an error shall be excluded Deviations of the ordered products from the deliv ered products such...

Страница 43: ...ernal control interference with the control soiling during construction phase insuffi cient water quality lack of hydraulic separation non specified valves viii if dimensioning is incorrect or if the...

Страница 44: ...Fig 32 Switch on heat generator pump 2 The measured flow rate is displayed this must correspond to the nominal flow Fig 33 Reading flow rate Setting p c Set the flow rate by turning the red adjustmen...

Страница 45: ...RS 25 7 5 922523 2 12 35 33 110 1 12 OLWA 18 Yonos Para RS 25 7 5 922523 2 64 44 00 200 2 04 OLWI 9 Stratos Para 25 1 8 internal 1 55 25 83 70 0 71 OLWI 13 Stratos Para 25 1 8 internal 2 12 35 33 110...

Страница 46: ...Power supply to the heat pump 13 Fig 17 OLWI distribution box 14 Fig 18 Heating buffer 14 Fig 19 Seal the appliance inside 1 16 Fig 20 Seal the appliance inside 2 16 Fig 21 Seal the appliance inside 3...

Страница 47: ...BA_OLW I OTE3_SW5x_EN_20160815_V2 47 48...

Страница 48: ...inz kontakt ochsner at www ochsner com Zentrale Werk Ochsner Stra e 1 A 3350 Haag Tel 43 0 5 042458 Fax 43 0 5 04245 349 kontakt ochsner at www ochsner com Partner Hotline 0820 201020 Ochsner W rmepum...

Отзывы: