8
Commissioning
8.1 Before starting
The heat pump has no separate ON/OFF switch. In
an emergency, the system must be shut down via
the specified circuit breaker. The circuit breaker
must be accessible so that an emergency
shutdown can be performed at any time.
Caution - risk to life
First-time start-up of electrical systems
is permitted only in the presence of a
qualified electrician.
Do not turn ON (or OFF) the power to the system,
until:
•
Nobody can be put at risk
•
All installation work on the heat pump is
completed
•
All wiring is completed
•
Voltages have been checked according to
the documentation
•
The hydraulic system has been filled with
water
•
The system has been fully vented
The supply voltage for the compressor must not
be turned on, until the refrigerant circuit and the
hydraulics have been filled with the correct
medium.
Once all conditions above have been checked and
met, the controller voltage of 230 VAC (fuse F1)
can be switched on for checking individual
functions.
Carefully check all sensors and their measurement
values for plausibility and all outputs used in your
hydraulic system for correct function.
CAUTION
Operating the heat pump with too little
or no refrigerant will damage the
appliance.
Operating
circulation
pumps without water in the system will
destroy the pump.
The heat pump must be commissioned by
OCHSNER customer service or an authorised
OCHSNER partner. The OCHSNER commissioning
guidelines apply. Operating the system without it
having been properly commissioned by factory
customer service will void all guarantee and
warranty rights.
8.2 Persons required on site
The electrician, installer and future system
maintainer or operator must be present during
commissioning for instruction.
Information for the system installer:
•
The OCHSNER customer service engineer /
customer service partner makes the user
specific adjustments according to the
information in the system datasheet. If the
system installer is not present during
commissioning or if a fully completed system
datasheet is not available, the system is put
into operation using the control factory
settings. OCHSNER will accept no liability for
any faulty operation (heating curve too low,
bivalent point too high, etc.). Any claims
resulting from this will be charged to the
system installer.
•
For the system to operate efficiently, it is
essential that hydraulic balancing is carried
out and the controller is adjusted according to
the system requirements.
•
Special work, such as venting, electrical
connections, renewed instruction, etc., not
included in the scope of work provided by
OCHSNER will be charged separately.
Содержание Air Eagle 414
Страница 2: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 2 of 76...
Страница 62: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 62 of 76 13 9 Electrical wiring diagrams EAGLE 717...
Страница 63: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 63 of 76...
Страница 64: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 64 of 76...
Страница 65: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 65 of 76...
Страница 66: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 66 of 76...
Страница 67: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 67 of 76 13 10 Electrical wiring diagrams EAGLE 414...
Страница 68: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 68 of 76...
Страница 69: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 69 of 76...
Страница 70: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 70 of 76...
Страница 71: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 71 of 76...
Страница 73: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 73 of 76 16 Declaration of conformity...
Страница 74: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 74 of 76...
Страница 75: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 75 of 76...