3.5 Foundation for the outdoor unit
A permanent foundation is required beneath the
outdoor unit. The foundation must meet the load
bearing requirements of the outdoor unit (see
section 13, Specification).
•
Provide for frost-free drainage (e.g. a gravel
bed with a frost-free connection to a drain)
for condensation that forms on the outdoor
unit.
•
Where refrigerant lines are to be laid in the
ground, ensure correct positioning of the
pipe liner when laying the foundations.
•
Use rigid underground sewage pipes or
flexible, double-skinned cable ducts (smooth
on the inside) for the pipe liner.
•
This must be done in accordance with the
relevant Building Codes of Practice and
regulations.
Take the expected wind loads at the
installation site into consideration.
Ensure that the outdoor unit is
adequately secured to the foundation
to prevent it from tipping over due to
wind loads.
CAUTION: Slipping hazard
If drainage for condensation is
inadequate, ice can build up in winter
in the area around the outdoor unit.
-
Ensure
drainage
for
condensation is sufficient even
at low temperatures.
-
Ensure that no ice is formed,
especially
around
walking
surfaces and entrances around
the outdoor unit.
NOTE
Insulation used beneath the soil must
be made of a closed-cell material.
Otherwise, the thermal insulation of
the material will be impaired.
Figure 7: EAGLE outdoor unit (view from below), fixing holes in the outdoor unit legs (dimensions in mm)
Содержание Air Eagle 414
Страница 2: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 2 of 76...
Страница 62: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 62 of 76 13 9 Electrical wiring diagrams EAGLE 717...
Страница 63: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 63 of 76...
Страница 64: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 64 of 76...
Страница 65: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 65 of 76...
Страница 66: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 66 of 76...
Страница 67: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 67 of 76 13 10 Electrical wiring diagrams EAGLE 414...
Страница 68: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 68 of 76...
Страница 69: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 69 of 76...
Страница 70: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 70 of 76...
Страница 71: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 71 of 76...
Страница 73: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 73 of 76 16 Declaration of conformity...
Страница 74: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 74 of 76...
Страница 75: ...BA_OCHSNER AIR EAGLE_414_717_V06_EN docx Page 75 of 76...