BA_AIR_BASIC_ELW_Multitower_OTE3_SW5x_CC_EN_V08.docx
Page 14 of 92
3.5 Wall bracket for wall mounting
NOTE
Observe the minimum clearances in
section 3.3.1.
Ensure that the mounting feet of the
outdoor unit are at least 300 mm clear
of the surrounding terrain. Take the
expected snow depth at the installation site into
consideration.
The outdoor units can be wall mounted using a
wall bracket.
The wall bracket consists of:
-
2 x wall bracket 600
-
4 x M10 threaded plate
-
4 x M10 washers
-
4 x M10 nuts
-
4 x rubber/metal buffers (A 40/30 M10) for
sound insulation
3.5.1 Requirements for wall mounting
Figure 11: Wall bracket dimensions
L = 600 mm, H = 340 mm
Material S235JR (RST 37-2), galvanised, zinc
coating min. 50 µm
Load bearing capacity
:
F1 = 2.55 kN
Connection forces:
FZ = 7.95 kN
FQ = 4.00 kN
Weight [kg]
AIR BASIC 109
38
AIR BASIC 211
66
AIR BASIC 416
130
AIR BASIC 618
130
3.5.2 Installing the wall bracket
CAUTION
The wall bracket must only be used for
installing the outdoor unit.
CAUTION
Before securing the wall bracket, ensure
that the wall has been tested according
to the specified loads for the respective
outdoor unit. The applicable engineering
standards must be observed.
NOTE
Ensure that the heat pump outdoor unit
is
accessible
for
service
and
maintenance work throughout the year.
Содержание AIR BASIC 109
Страница 2: ...BA_AIR_BASIC_ELW_Multitower_OTE3_SW5x_CC_EN_V08 docx Page 2 of 92...
Страница 22: ...BA_AIR_BASIC_ELW_Multitower_OTE3_SW5x_CC_EN_V08 docx Page 22 of 92...
Страница 34: ...BA_AIR_BASIC_ELW_Multitower_OTE3_SW5x_CC_EN_V08 docx Page 34 of 92 Dimensions Figure 37 T200 dimensions...
Страница 78: ...BA_AIR_BASIC_ELW_Multitower_OTE3_SW5x_CC_EN_V08 docx Page 78 of 92 11 4 Declaration of conformity...
Страница 79: ...BA_AIR_BASIC_ELW_Multitower_OTE3_SW5x_CC_EN_V08 docx Page 79 of 92...
Страница 80: ...BA_AIR_BASIC_ELW_Multitower_OTE3_SW5x_CC_EN_V08 docx Page 80 of 92...
Страница 81: ...BA_AIR_BASIC_ELW_Multitower_OTE3_SW5x_CC_EN_V08 docx Page 81 of 92...
Страница 82: ...BA_AIR_BASIC_ELW_Multitower_OTE3_SW5x_CC_EN_V08 docx Page 82 of 92 11 5 ERP Data...
Страница 83: ...BA_AIR_BASIC_ELW_Multitower_OTE3_SW5x_CC_EN_V08 docx Page 83 of 92...
Страница 84: ...BA_AIR_BASIC_ELW_Multitower_OTE3_SW5x_CC_EN_V08 docx Page 84 of 92...
Страница 85: ...BA_AIR_BASIC_ELW_Multitower_OTE3_SW5x_CC_EN_V08 docx Page 85 of 92...
Страница 86: ...BA_AIR_BASIC_ELW_Multitower_OTE3_SW5x_CC_EN_V08 docx Page 86 of 92...
Страница 87: ...BA_AIR_BASIC_ELW_Multitower_OTE3_SW5x_CC_EN_V08 docx Page 87 of 92...
Страница 90: ...BA_AIR_BASIC_ELW_Multitower_OTE3_SW5x_CC_EN_V08 docx Page 90 of 92...
Страница 91: ...BA_AIR_BASIC_ELW_Multitower_OTE3_SW5x_CC_EN_V08 docx Page 91 of 92...