982000-AIR-M2-M4-EN03.1 | www.ochsner.com 3
CONTENTS
1.
1.1
1.1.1 Arrangement of safety information
1.1.2 Symbols and possible dangers
1.1.3 Keywords 4
1.2
1.3
1.4
2.
2.1
2.2
3.
3.1
3.2
3.2.1 Indoor unit
3.2.2 Outdoor unit
3.2.3 Heat pump control unit
3.3
4.
4.1
4.1.1 Flow temperatures
4.1.2 Ventilation 8
4.1.3 Heating setback program
5.
6.
7.
7.1
7.2
Regulations, codes and standards
8.
8.1
8.2
Hydraulic variants of the indoor unit
9.
Preparing to install the appliance
9.1
Indoor unit installation location
9.1.1 Keep minimum clearances
9.2
Outdoor unit installation location
9.2.1 Keep minimum clearances
9.3
Foundations for the outdoor unit
9.3.1 Laying spot foundations
9.3.2 Laying strip foundations
9.3.3
9.4
Preparing the refrigerant lines
9.4.1 Line lengths
9.4.2 Pipe diameter
9.4.3 Preparing the wall outlets
9.4.4 Preparing refrigerant lines passing through open air
9.4.5 Preparing underground refrigerant lines
9.5
Preparing the electrical connections
9.5.1 Heat pumps for three-phase alternating current 22
9.5.2 Heat pumps for single phase alternating current 23
9.5.3 Cables from main distributor to indoor unit
9.5.4 Cables from indoor to outdoor unit
9.5.5 Temperature sensor
9.5.6 Pumps and servomotors (230 VAC)
9.5.7 PSU signal contact
9.5.8 Smart Grid
10.
10.1 Installation of indoor unit
10.1.1 Delivery and transportation
10.1.2 Positioning the appliance
10.1.3 Disassembling the appliance casing
10.1.4 Assembling the appliance casing
10.2 Installing the outdoor unit
10.2.1 Delivery and transportation
10.2.2 Positioning the appliance
10.2.3 Disassembling the appliance casing
10.2.4 Installing the snow cover
10.2.5 Fitting the cylindrical silencer
10.2.6 Installing the SSP snow cover
10.3 Connecting the heat sink system
10.3.1 Connecting the heating water
10.3.2 Safety valve drain
10.3.3 Filling the heating system
10.3.4 Diaphragm expansion vessel (DEV)
10.3.5 Flow metering
10.3.6 Cooling version
10.3.7 Connecting the DHW
10.4.1 General 34
10.4.2 Electrical connection of the indoor unit
10.4.3 Electrical connection of the outdoor unit
10.5 Connecting heat source system
10.5.1 Connecting the refrigerant lines
10.5.2 Checking for leak tightness
10.5.3 Filling the refrigerant circuit with refrigerant
10.5.4 Insulating the refrigerant lines
11.
11.1
Before switching on for the first time
11.2 Testing the control circuit
11.3
11.4 Heat generator pump (HGP)
11.5 Necessary conditions for commissioning
11.7 Decommissioning 45
12.
12.1 Fault messages on the master controller
12.2 Reset high limit safety cut-out
13.
13.1 Testing safety valve
13.2 Maintenance contract
14.
14.1 Heat pumps for three-phase alternating current 50
14.1.1 Data table
14.1.2 Output diagrams
14.1.3 Details of energy consumption
14.2 Heat pumps for single phase alternating current 62
14.2.1 Data table
14.2.2 Output diagrams
14.2.3 Details of energy consumption
14.3 Limits of use
14.4 System schematic diagrams
14.5 Voltage quality in island mode
14.6 Dimensions and connections
14.6.1 Indoor unit
14.6.2 Outdoor unit
15.
16.
17.
Содержание AIR 11
Страница 2: ......
Страница 91: ...INSTALLATION Declaration of Conformity 982000 AIR M2 M4 EN03 1 www ochsner com 91 16 Declaration of Conformity...
Страница 92: ...INSTALLATION Declaration of Conformity 92 www ochsner com 982000 AIR M2 M4 EN03 1...
Страница 99: ...982000 AIR M2 M4 EN03 1 www ochsner com 99...