AcquiSuite Ally 12 & 48 User Guide (Rev D)
32 |
P a g e
Wiring the
AcquiSuite
™
Ally Meter in a 3-wire, Split
ɸ
Service Panel
High voltage MAY BE PRESENT. Risk of electric shock. Life threatening voltages may be
present. Qualified personnel only.
Illustrating the intended wiring configuration for each of the Service Types
available in the Service drop-down l
ist under “Meter Setup”
EXAMPLE LOADS:
Single Phase L1-N or L2-N 110 VAC: Lighting, Appliance, Living Zone
Single Phase L1
–
L2 220 VAC:
Water Heater, Clothes Dryer, Equipment with no neutral wire.
Split Phase L1
–
L2 220 VAC:
Service Entrance, Equipment with neutral wire.
3-Wire, 1 Phase used
On MAINS
L1-N, L2-N
(
R
ō
Coils
Shown)
Single Phase
110 VAC Plug Loads
L1-N or L2-N
Single Phase
220 VAC Plug Load
L1-L2
Meter is powered
from L1 to L2 on
the V Input 1
terminal
(Label as Disconnect))
Connect the
Neutral wire to
V INPUT 1 (N) on
the meter
3-Wire, 1 Phase
Split Load
L1-N, L2-N
Содержание AcquiSuite Ally
Страница 56: ...AcquiSuite Ally 12 48 User Guide Rev D 56 P a g e MENU NAVIGATION ...
Страница 57: ...AcquiSuite Ally 12 48 User Guide Rev D 57 P a g e COMMUNICATION NAVIGATION ...
Страница 58: ...AcquiSuite Ally 12 48 User Guide Rev D 58 P a g e APPENDIX B ENCLOSURE DIMENSIONS Enclosure Dimensions ...
Страница 59: ...AcquiSuite Ally 12 48 User Guide Rev D 59 P a g e APPENDIX C MOUNTING TEMPLATES Enclosure Drill Template ...
Страница 60: ...AcquiSuite Ally 12 48 User Guide Rev D 60 P a g e AMC48 Mounting Plate Template AMC12 Mounting Plate Template ...