o

 

The length of small bore tubing (usually ¼”) used to connect the cooler to the water 
supply should be kept to a minimum and must not exceed 20 meters (65 feet). 

o

 

If the planned cooler location is more than 20 meters (65 feet) from the connection point 
to the water source, then an additional water supply line should be added.

 

 
Fittings: 

 
All fittings and piping used to attach the water cooler to the water supply must be approved to the 
relevant local standards. 
 
These fittings can be purchased from Tri Palm International or Tri Palm International can refer you to 
reputable suppliers of Point-of-Use parts in your market place.

 

 
Installation: 

 
Each installation should include the following components 

 

Pressure limiting devices should be installed to protect the cooler and supply tubing from 
water pressure surges in locations where they may occur. 

 

Each cooler should have an independent isolating valve. This is intended so that the cooler can 
be replaced without draining long lengths of piping. 

 
 

EUROPE ONLY 

 
In accordance with EPDWA guidelines, the installation must also include the following additional 
components: 

A non return valve must be fitted at the point of connection to the water supply. 

An anti leak device must be fitted at the point of connection to the water supply 

downstream of the isolating and non return valves. 
 
 
The following general guidelines apply to the water supply line: 

 

Pipework should avoid light fittings and electrical and gas piping 

 

Pipework in public view should be securely and neatly fixed. 

 

All pipework should be accessible and clearly labeled. 

 

Pipework should be lagged when necessary to avoid freezing or high temperatures. 

 

 

EUROPE ONLY 

Sanitisation: 

EPDWA guidelines state: 

All coolers must be sanitized before commissioning 

When a customer signs up to the sanitisation program, the cooler should be sanitized 

every 6 months 

Sanitisation should be carried out in accordance with the manufacturer’s instructions – 

see attached documents. 

 

Содержание P1PV Series

Страница 1: ...INSTALLATION SERVICE INSTRUCTIONS P1PV P1PVCD Series Coolers...

Страница 2: ...th 345 mm 13 6 in Net Weight 23 kg 51 lbs Filter Compartment Height 560 mm 22 in Width 260 mm 10 2 in Depth 120 mm 4 7 in Electrical Specification P1PVKY P1PVK P1PVHSY P1PVHS P1PVHSKY P1PVHSK P1PVCDKY...

Страница 3: ...he water colder and vice versa Ambient Water Circuit The water in the ambient water circuit is not cooled the temperature of the water will be the same as the temperature of the water that comes out o...

Страница 4: ...to NSF standards 51 and 61 The machine is connected to the water supply by a female bulkhead fitting The entire internal water circuit and all the components which come in contact with water are food...

Страница 5: ...no marks or physical damage to the cooler b All accessories are present c All wires and electrical connections are in place at the back of the cooler d All tubes and water connections are in place e...

Страница 6: ...ooler 9 The cooler is now ready for transportation to the customer s premises NOTE Whenever you transport the cooler to or from your premises you should ensure that a shipping bag is placed over the c...

Страница 7: ...valve prior to opening it The container needs to have a minimum capacity of 2 litres 2 quarts Re assemble the cooler by following the above instructions in the reverse order Filter Installation The P1...

Страница 8: ...followed when installing an OASIS water cooler onto an existing mains water system It is recommended that all companies undertake the necessary EPDWA training courses to help maintain the professiona...

Страница 9: ...here they may occur Each cooler should have an independent isolating valve This is intended so that the cooler can be replaced without draining long lengths of piping EUROPE ONLY In accordance with EP...

Страница 10: ...damage to the cooler b That all accessories are present c That all the wires and electrical connections are in place at the back of the cooler d That the cooler is clean and dust free e Sit the machin...

Страница 11: ...off valve in the filter system is in the Open position Water flows from the ambient or hot system no water flows from cold system o Water within cooling system is frozen Check the thermostat setting t...

Страница 12: ...afety Instructions Isolate the water cooler from the water supply this may be done by closing any shut off valve fitted to the installation or temporarily disconnecting the cooler from the water suppl...

Страница 13: ...20 034734 002 034734 002 TUBING 3 8 OUTLET VENT Equipment Household bleach 5 sodium hypochlorite Mild soap solution Plastic bucket One 12 length of OD plastic tubing Preparation of Filter Cleaning Ca...

Страница 14: ...rd at the rear of the machine Wear clean rubber gloves to carry out the cleaning functions Remove and clean the drip tray assembly Wipe down all machine surfaces with a mild soap solution or mild clea...

Страница 15: ...OASIS Corporation Disconnect the blue tube running from the solenoid to the hot tank inlet see figure for location of this tube Thread the blue tubing through the hole in the shelf as shown above as s...

Страница 16: ...cooler to the mains supply Drain at least 5 litres of hot water from the outlet before switching on the hot tank THIS APPLIANCE MUST BE EARTHED This appliance is not suitable for unsupervised use by y...

Отзывы: