P1PV / P1PVCD Series
Installation & Service Instructions
030099-347 Rev. 2
pg 5 of 16
© Copyright 2007 OASIS Corporation
Spare Parts:
•
Tri Palm International supplies spare parts for all of its watercoolers. For European service,
please check the OASIS web-site at
www.oasis.ie
for full illustrated parts breakdowns that give
full details of all replacement parts. For service from the United States, refer to the Tri Palm
International web-site
www.tripalmint.com
Pre-Delivery Inspection:
1.
Examine the packaging for signs of damage – report any damage to the carrier.
2.
Remove the carton from the cooler – cut the strapping tape and lift the carton from the cooler. Store
the carton and corner posts for repacking the cooler prior to shipping it to the customer.
3.
Remove the shipping bag from the cooler
4.
Carry out a general inspection of the cooler, ensuring that :
a)
There are no marks or physical damage to the cooler
b)
All accessories are present
c)
All wires and electrical connections are in place at the back of the cooler
d)
All tubes and water connections are in place
e)
That the cooler is clean and dust free
5.
Install your filtration system (see relevant section in this manual)
6.
Flush out the water cooler
a)
Connect the water supply to the bulkhead fitting at the rear of the unit
b)
Make sure the hot tank switch is off, if applicable, then connect the unit to a power supply
c)
Caution: The unit is now live and suitable safety precautions should be taken
d)
For models with hot tanks, the two buttons on the front left of the cooler face must be pressed at
the same time to dispense hot water. Press the dispensing button for hot water and keep the
button depressed until the water from the outlet runs clear – note that it will take some time to
bleed all of the air from the hot tank.
e)
If your model is a Cook N’ Cold model, press and keep the button depressed for ambient
temperature water until the water from the outlet runs clear.