![NUVE NC 300 Скачать руководство пользователя страница 29](http://html1.mh-extra.com/html/nuve/nc-300/nc-300_user-manual_1719828029.webp)
29
7.
Check the water reservoir, piping and plastic parts of
autoclave.
Annual
8.
Run the sterilization programs of autoclave and check the
operational/ sterilization parameters.
Annual
9.
Check the precise operation of the earth leakage relay and
electrical control systems.
Annual
10.
Check and tighten all screw connections in the control box,
valves and instrument.
Annual
11.
Check the temperature sensor calibration.
Annual
12.
Validate autoclave effectiveness (loading/ unloading).
6 months/ Annual
13.
Observe the closing device for excessive wear.
5 years
14.
All safety valves exposed to direct steam pressure must be
checked.
5 years
Safety tests (pressure vessel, efficiency, electrical) shall be performed in accordance
with local rules or regulations, by an authorized inspector.
According to calculations, number of allowable cycles for the operation conditions are
10.000 at pressure fluctuation between 0 bar to 2,05 bar and 20.000 at pressure
fluctuation between 0 bar to 1,05 bar.
CLEANING
Clean the device when the chamber is at room temperature after disconnecting the power
cable.
If the unit is used every day, the sterilization chamber shall be cleaned weekly. Liquid dish
detergent may be used for stubborn stains. The probable impact of other cleansing chemicals
shall be sought after prior to application and shall be handled with care.
A soft washcloth shall be used not to cause any detriment in the chamber.
The chamber shall be checked before each and every sterilization loading against any
contamination; and shall be immediately cleaned if needed.
The sterilization load should have been disinfected prior to placement into the sterilization
chamber.
Содержание NC 300
Страница 12: ...12 5 6 GENERAL PRESENTATION Figure 3 1 2 3 4 5 6 7 8...
Страница 18: ...18...
Страница 35: ...35 11 ELECTRICAL CIRCUIT DIAGRAM...