NSS Series
Nuvair
Page 19
www.Nuvair.com
10.0 Maintenance
10.1 Foreword
To obtain the best possible performance from the fill containment station and ensure a long working life for all
its parts it is essential that personnel follow the use and maintenance instructions with extreme diligence. It is
advisable to read the information below and consult the manual every time a problem arises. For further
information, please contact Nuvair:
Phone:
+1.805.815.4044
Email:
DANGER
Depressurize the entire fill containment station circuit before carrying out any maintenance
tasks. To depressurize the fill containment station, open the drain valve.
10.2 General
•
Proper maintenance of the fill containment station requires thorough cleaning.
•
This type of refill station, designed and built according to the most advanced technological criteria,
requires only minimum preventive and routine maintenance.
•
The residual pressure present in the fill containment station and all lines must be released.
•
During disassembly and reassembly of the fill containment station, always use suitable wrenches/tools
so as not to damage the relevant components.
•
Loosen stiff parts with a copper or plastic mallet.
•
When refitting parts make sure they are clean and lubricated sufficiently.
•
Fill containment station maintenance tasks must only be carried out by authorized personnel and
recorded in the Service Log of this manual.
10.3 Unscheduled Work
Unscheduled work involves repairs and/or replacement of the mechanical parts of one or more fill containment
station components. This work normally needs to be done after some years of use. If substantial modifications
are made, the manufacturer cannot be held liable for any dangers that might arise. This work must be carried
out by a Nuvair approved mechanic.