www.NutrichefKitchen.com
5
GETTING STARTED
Before your first brew:
Close the tap and riser pipe valve. Add about 5-10 litres of water to the brew kettle.
•
Check for any water leakage underneath the brew kettle or around any of the fittings. If any water is
found, check and tighten fittings. Check that the gaskets are properly inserted. Read instruction for
pump assembly/disassembly (described later in this user manual), and check silicon hose and fittings.
If there are no indications of any leakages, connect the lid hose CamLock connector to the riser pipe,
place the lid on top of the boiler and connect the power cord to a wall outlet. The built-in light in the
brew program selector will now illuminate.
Malt basket, handle and filter screen bottom
When you choose to use malt basket, at first
you will use PROG III, all phase will be
completed in this program without suspend.
Malt basket placed on the top bracket