Quick Lube HF
Nussbaum Automotive Solutions, LP | 1932 Jordache Court, Gastonia, NC 28052 | 704.864.2470 | Email:
|
www.nussbaum-usa.com
12
10.
Filling the Hydraulic Systems
The lift is fully assembled and tested to assure functionality at the factory and is delivered with the setup hoses
connected to the unit. After unpacking the power unit, loosen the Allen head screws to remove the back cover and fill
the power unit with a high-quality hydraulic oil with a viscosity of AW32. The required oil volume is approximately 2
gallons. After filling, the oil must be near the top of the oil dipstick or to the “fill” line.
Make certain the lift area is free of all bystanders.
Check all hydraulic connections for tightness, most leaks occur at connection points.
11.
Preparing for Installation
11.1.
Safety Checks and Tools
The safety checklist is necessary to guarantee safe operation of the lift during use.
Safety checks should occur as follows: after installation, before initial startup, after initial startup, at least once a year,
and any time modifications have been made to the lift. The safety checklists can be found before the Appendix section.
A.
TOOLS NEEDED FOR THE INSTALLATION
Marking Pen
Tape Measure
4’ Level
Hammer Drill
½” & ¼” Masonry Bits
Metric Hex Key Set
Hammer
SAE Wrench Set
Transmission funnel
B.
SUPPLIES NEEDED FOR INSTALLATION
8 ½” x 6-½” concrete anchors (additional 16 if installing surface ramps)
4 ¼” x 3” concrete anchors
2 gallons AW32 light hydraulic fluid or equivalent.
Danger! The lift is pre-tested at the factory, so the hoses and
cylinders are already full of oil. Over-filling the system before
bleeding and lowering can cause the tank to overflow due to the
excess fluid.
This procedure must always be completely carried out, meaning
first fill and then bleed (see section 12.5). This is the only method of
balancing a lift with HyperFlow
Danger! Before the installation of the lift, secure the installation
area to prevent access by unauthorized persons.
Attention!
Before beginning installation, familiarize yourself with
the entire installation process and with the “Foundation Plan”
(Appendix 4 and5)
.