76
OPI_SMART LIFT 2.30 SL-2.35 SL-2.40 SL - HYMAX S 3000-S3500-S4000_V1.2_DE-EN-FR-ES-IT
Set up protocol
i
After successful set up, complete this form fully, sign it, make a copy and send the original to the man-
ufacturer within a week. The copy remains in the inspection book.
Otto Nußbaum GmbH & Co.KG
Korker Straße 24
D-77694 Kehl-Bodersweier
The system with serial number _________________________ was set up on (date) __________________________
at (company name) _________________________________ in (town, city) _________________________________
checked for function and safety and put into operation.
The set up was done by the operating company / specialist (score out the one that does not apply).
After successful inspection of function and safety by a trained assembler, the lift is transferred without elec-
trical connection (e.g. plug) to on-site power supply An on-site electrical connection between the lift and
the power supply is to be done by a qualified electrician (see details in the electrical plan).
The operating company confirms proper lift set up, has read and will comply with all information contained
in this operating manual and inspection book, and will keep this document accessible to trained operators
at all times.
The specialist confirms proper lift set up, has read all information in this operating manual and inspection
book, and has transferred the documents to the operating company.
Only fill out if the system has a fixed anchor.
Anchor used *)
___________________________________________________________
Type/ brand
Minimum anchor depth *) complied with: __________ mm
Tightening torque *) complied with:
__________ Nm
_________________________ _____________________________________________ _________________________
Date
Name, operating company and company stamp
Operating company signature
_________________________ _____________________________________________ _________________________
Date
Name, specialist
Signature of specialist
Service partner:
_________________________________________________________________________
Stamp
*) See enclosed anchor manufacturer sheet
Содержание ATT HYMAX S 3000
Страница 17: ...OPI_SMART LIFT 2 30 SL 2 35 SL 2 40 SL HYMAX S 3000 S3500 S4000_V1 2_DE EN FR ES IT 87...
Страница 18: ...88 OPI_SMART LIFT 2 30 SL 2 35 SL 2 40 SL HYMAX S 3000 S3500 S4000_V1 2_DE EN FR ES IT...
Страница 20: ...90 OPI_SMART LIFT 2 30 SL 2 35 SL 2 40 SL HYMAX S 3000 S3500 S4000_V1 2_DE EN FR ES IT...
Страница 21: ...OPI_SMART LIFT 2 30 SL 2 35 SL 2 40 SL HYMAX S 3000 S3500 S4000_V1 2_DE EN FR ES IT 91...
Страница 23: ...OPI_SMART LIFT 2 30 SL 2 35 SL 2 40 SL HYMAX S 3000 S3500 S4000_V1 2_DE EN FR ES IT 93...
Страница 24: ...94 OPI_SMART LIFT 2 30 SL 2 35 SL 2 40 SL HYMAX S 3000 S3500 S4000_V1 2_DE EN FR ES IT 3 4 Foundation plans...
Страница 26: ...96 OPI_SMART LIFT 2 30 SL 2 35 SL 2 40 SL HYMAX S 3000 S3500 S4000_V1 2_DE EN FR ES IT...
Страница 27: ...OPI_SMART LIFT 2 30 SL 2 35 SL 2 40 SL HYMAX S 3000 S3500 S4000_V1 2_DE EN FR ES IT 97...
Страница 28: ...98 OPI_SMART LIFT 2 30 SL 2 35 SL 2 40 SL HYMAX S 3000 S3500 S4000_V1 2_DE EN FR ES IT...
Страница 29: ...OPI_SMART LIFT 2 30 SL 2 35 SL 2 40 SL HYMAX S 3000 S3500 S4000_V1 2_DE EN FR ES IT 99...
Страница 30: ...100 OPI_SMART LIFT 2 30 SL 2 35 SL 2 40 SL HYMAX S 3000 S3500 S4000_V1 2_DE EN FR ES IT...
Страница 98: ...OPI_SMART LIFT 2 30 SL 2 35 SL 2 40 SL HYMAX S 3000 S3500 S4000_V1 2_DE EN FR ES IT 375...