background image

04/21/20

Page 5

Champion

® 

RC300    

SECTION II

MAINTENANCE

DISASSEMBLY

 

  Maintenance should be performed in a clean environment.

CAUTION

USE CAUTION WHEN HANDLING DOWN THE  HOLE HAMMER PARTS.  NUMA HAMMER 

PARTS ARE MANUFACTURED FROM HARDENED, HEAT TREATED MATERIALS.  DROPPING 

OR STRIKING THESE PARTS MAY CAUSE SEVERE DAMAGE.  STRIKING THE HAMMER 

PARTS WITH HAMMERS, CROWBARS OR LIKE INSTRUMENTS WILL VOID THE WARRANTY.

 

  Tools needed: hammer stand, 26" (660 mm) "J" or fork wrench (possibly incorporated in 

the hammer stand), overhead crane or lift truck, pulldown visetong with a 28" (711 mm) 

diameter capacity or a self contained power wrench capable of 200,000 foot pounds 

of torque, lifting eyes, 2" (51 mm) diameter brass rod or mild steel rod 3 to 5 feet (1 m 

to 1.5 m) long, snap ring pliers, chains, lifting slings, a drift pin and several difference 

sized screwdrivers.

 

  Clean the outside of the hammer. This will insure a good surface to clamp on.

 

  With the hammer in a vertical position, remove the collection tube. The collection tube 

is equipped with two 1/2" UNC threads for lifting eyes.

 

  The collection tube can be replaced without disassembly of the hammer. Prior to 

removal of the collection tube, pressure wash the inside diameter of the collection 

tube to remove any cuttings or debris. The collection tube is equipped with two 1/2" 

UNC tapped holes for lifting eyes to facilitate removal. With the hammer in a vertical 

position, use an overhead crane or lift truck of appropriate capacity to remove the 

collection tube. Thoroughly lubricate the collection tube O.D. and reverse the process 

to install the new collection tube.

CAUTION

    FAILURE TO THOROUGHLY CLEAN THE COLLECTION TUBE BEFORE REMOVAL MAY 

ALLOW FOREIGN MATERIAL TO CONTAMINATE THE HAMMER.

 

  Using an overhead crane or lift truck of appropriate capacity, place the hammer on a 

hammer stand and secure it in the wrench. The chuck end can be held by the 26" (660 

mm) flats, in the wrench. The backhead is also held in the 26" (660 mm) wrench. Place 

the visetongs on the area of the case where the bit bearing is located when working 

on the chuck end of the hammer. When working on the backhead end of the hammer, 

place the chain vise on the area of the case where the feed tube housing in located. 

Содержание Champion RC300

Страница 1: ...646 Thompson Road Thompson CT 06277 USA US Toll Free 800 356 NUMA Tel 860 923 9551 Fax 860 923 2617 E mail numa numahammers com Website www numahammers com Patents 4 530 408 4 919 221 4 962 822 5 205...

Страница 2: ......

Страница 3: ...Ring 3 16 Bit Retaining Rings 4 17 Thrust Washers 4 18 Chuck 4 19 Chuck Bushing 4 20 Drive Plates 4 Section II Maintenance 5 Disassembly 5 Inspection 8 General Assembly 11 Feed Tube Assembly 11 Hammer...

Страница 4: ...nty period all of Numa s obligations hereunder shall terminate LIMITATION OF LIABILITY Numa shall not be liable to Buyer whether in contract in tort including negligence and strict liability under any...

Страница 5: ...e most commonly used in large diameter drilling applications The Champion RC300 hammer is designed to operate using air pressure from 100 PSI to 200 PSI 6 9 Bar to 13 8 Bar with compressors having 300...

Страница 6: ...een shut off The check valve in the hammer balances the hydrostatic pressure in the hole thereby preventing contaminants from entering the hammer 5 CHECK VALVE SPRING The check valve spring provides t...

Страница 7: ...ousing and is designed with a long bearing surface to maintain alignment in the feed tube housing 12 PISTON The piston functions as the only moving part in the hammer controlling the operational air c...

Страница 8: ...he case and one between the chuck and the case provide for easy disassembly 18 CHUCK The chuck threads into the bottom end of the case with a large cross section thread form It has internal splines th...

Страница 9: ...equipped with two 1 2 UNC threads for lifting eyes The collection tube can be replaced without disassembly of the hammer Prior to removal of the collection tube pressure wash the inside diameter of th...

Страница 10: ...e or lift truck move the hammer into an upright position with the chuck end down Withanadequateliftingdevice liftandsupportthehammerwhileunscrewingthe chuck After setting the hammer down and while lif...

Страница 11: ...its side so that the bit end is facing you Locate the seam in the chuck bushing Insert a screwdriver into the slot in the middle of the seam and pry the chuck bushing from the under cut Remove the chu...

Страница 12: ...ECK VALVE SEAT Inspect the outside diameters for nicks burrs and scoring Remove all minor irregularities with emery cloth Replace if necessary CHECK VALVE CHECK VALVE SPRING Inspect the outside diamet...

Страница 13: ...y cloth Replace if necessary PISTON Inspect the striking face inside and outside diameters for nicks scoring and cracks Polish the piston with emery cloth to remove all minor irregularities Cracked pi...

Страница 14: ...regularities with a file or emery cloth Replace if necessary THRUST WASHERS Inspect for damage such as cracks and deformations Replace if necessary CHUCK Inspect for cracks and burrs For continued use...

Страница 15: ...ube then slide it along the feed tube until it seats against the feed tube collar Position the piston vertically Place the smallest outside diameter of the feed tube housing on the piston so that the...

Страница 16: ...tube assembly See the stacking diagram on page 14 for proper installation Install the collection tube housing o ring and the collection tube o ring in the I D of the collection tube housing Install t...

Страница 17: ...thread shoulder Thread the chuck into the case and hand tighten The chuck should sit flat against the end of the case With the hammer in a vertical position and the bit installed insert the collectio...

Страница 18: ...915 1 Check Valve Spring 008916 1 Collection Tube Housing O Ring 008918 1 Collection Tube O Ring 008919 2 Collection Tube Housing 008917 1 Belleville Washer 008921 2 See Exploded View Figure 3 2 Page...

Страница 19: ...N III PARTS IDENTIFICATION EXPLODED VIEW Feed Tube Snap Ring 008928 1 Feed Tube 008929 1 Orifice O Ring 008919 3 Feed Tube Compression Ring 008930 1 Feed Tube O Ring 008931 2 Feed Tube Housing 008912...

Страница 20: ...FM L SEC DRILL PRESSURE BAR 6 9 10 3 13 6 17 2 DRILL PRESSURE PSI 100 150 200 250 1 2 ORIFICE O RING ORIFICE O RING INSTALLED 1 REMOVED 2 Operation Above 250 PSI 17 BAR Is Not Recommended NOTE Numa RC...

Страница 21: ...exaco Caltex Rock Drill Lube 100 Rock Drill Lube 320 Chevron Vistac 150 Vistac 320 Conoco Conoco 150 Conoco 320 Numa Bio Blend RDP 150 RDP 320 Table 5 1 Recommended Rock Drill Oil CAUTION ROCK DRILL O...

Страница 22: ...gn contaminants from sticking to the connector ends SHORT TERM STORAGE When the Champion hammer will be stored for only a short period of time the following steps should be taken Blow the hammer clear...

Страница 23: ...environment RESTARTING Before restarting the hammer after prolonged periods of inactivity disassemble and inspect all internal hammer parts If any internal hammer parts have oxidized use an emery clo...

Страница 24: ...the most wear and should be used to determine the frequency of bit sharpening When the flats on the gauge buttons become a maximum of 1 8 3 mm wide it is time to resharpen Refer to figure 7 1 SHARPEN...

Страница 25: ...Tube O Ring 008919 2 4 Collection Tube Housing 008917 0 1 Belleville Washer 008921 0 2 Feed Tube Assembly 008922 1 2 Feed Tube Snap Ring 008928 1 2 Feed Tube 008929 1 2 Orifice O Ring 008919 3 6 Feed...

Страница 26: ...Page 22 04 21 20 Champion RC300 NOTES...

Страница 27: ...04 21 20 Page 23 Champion RC300 NOTES...

Отзывы: