7
Exposed Installation:
1.
Make sure the pipes are at the correct centres as shown above.
2.
Secure the valve to the wall using the screws provided. Be careful
not to damage the screws or the valve in the process.
3.
Flush the pipework before connecting the valve. Debris can
prevent the valve working correctly.
4.
Connect the pipework using the compression fittings provided.
Check for leaks.
5.
The water outlet side can be changed if required.
6.
Calibrate and commission the valve as advised.
Note: Please make sure the inlet pipework is plumbed entering the
valve on the correct sides. If the pipes are plumbed the wrong way
around the cartridge can be taken out, turned 180° and replaced. This
prevents the need for the pipework to be changed.
Содержание VSQ2
Страница 1: ...SEQUENTIAL SHOWER VALVE INSTRUCTION MANUAL PLEASE LEAVE THIS MANUAL WITH THE END USER ...
Страница 4: ...2 2 DIMENSIONS ALL DIMENSIONS ARE APPROXIMATE Exposed Concealed ALL DIMENSIONS ARE APPROXIMATE ...
Страница 7: ...5 5 COMPONENTS Exposed Concealed ...
Страница 10: ...8 Concealed Installation A B C ...