13
Step 7:
Step 8:
Step 9:
The valve is now calibrated and is ready for commissioning and
handover. Remember to leave this instruction and installation booklet
with the end user.
Once the stabilised outlet
temperature is correct replace the
spindle sealing screw.
Make sure the spindle screw is fully
screwed in place and no water is
coming from the spindle hole.
The handle can now be replaced
and secured using the screw and
washer. The indices can then be
replaced.
Check for leaks.
If a lever handle is being used
please ensure that the lever is in
the correct position.
In order to calibrate the valve to the correct
outlet temperature please place a 3mm flat
bladed screw driver into the spindle. Locate
the calibration screw slot inside and turn
anticlockwise to increase the temperature or
clockwise to reduce it. Allow the valve to
stabilise after every adjustment and measure
the outlet temperature.
Содержание VSQ2
Страница 1: ...SEQUENTIAL SHOWER VALVE INSTRUCTION MANUAL PLEASE LEAVE THIS MANUAL WITH THE END USER ...
Страница 4: ...2 2 DIMENSIONS ALL DIMENSIONS ARE APPROXIMATE Exposed Concealed ALL DIMENSIONS ARE APPROXIMATE ...
Страница 7: ...5 5 COMPONENTS Exposed Concealed ...
Страница 10: ...8 Concealed Installation A B C ...