Standard Assessment Procedure 2005 – Appendix Q De-centralised MEV Installation 

Guide 

Page 2 of 6 

 

Introduction 

 
This document is to be used in support of the SAP Appendix Q scheme which provides 
tested performance values for De-centralised MEV products.  
 

Note that all checklist items must be answered YES in order for the SAP Appendix Q 
test figures to be used in ‘As built’ SAP calculations.  If any checklist items are answered 
NO then SAP default figures must be used.  Systems must be designed by a 
manufacturer designer and sized correctly to qualify for SAP Appendix Q figures. 

 
SECTION 1: 

INSTALLATION GUIDANCE 

 

1.  Ductwork Installation 

Decision 

Yes, No or 

N/A 

Have the ducts been installed with as little air resistance and 
leakages as possible (flexible ducts should be avoided)?   

Note:  Refer to HVCA DW/143 document ‘A Practical Guide to Ductwork Leakage 
Testing’ for detailed guidance on air tightness.  Rigid plastic ducting is 
recommended and flexible duct should only be used in very short lengths and 
mainly just to connect the ductwork to the units/diffusers or to overcome particular 
obstructions. 

 

If flexible ducting has been used, has it been pulled taut to minimise 
system resistance? 

 

Has the number of duct bends been minimised to ensure adequate 
air flow and least resistance?  Bends should have a minimum radius 
at least the same as the diameter of the ducting used? 

Refer to Figure 1 if using flexible ducting 

 

Have the fans and ducting placed in unheated voids been insulated 
to reduce the possibility of condensation forming (see notes below)? 

Note: Ducts should be insulated with the equivalent of at least 25mm of insulating 
material with a thermal conductivity of 0.04W/mK.  Where a duct rises vertically it 
may be necessary to fit a condensation trap in order to prevent backflow of any 
moisture in the product.  Insulation should be applied to both warm and cold air 
ducts.  Cold air ducts should be wrapped additionally with a vapour barrier outside 
the insulation.  Ducts with cold air running in warm environments will condense on 
the outside of the duct. 

 

Have recommended duct jointing collars and components been 
used to ensure appropriate duct performance (duct runs should be 
as air tight as possible)?   

Note:  All the joints should be sealed correctly either using duct tape or silicon.   

 

 
 
 
 
 

Содержание MEV-B

Страница 1: ...reduce performance if necessary The unit is delivered with the BOOST speed adjustment set to 100 See the adjustments information on page 4 Coding MEV B Single fan unit MEV 2B Twin fan unit with auto...

Страница 2: ...it casing Connect the ductwork to the outlet spigot and fix the unit to the surface Any subsidiary inlet ductwork can now be connected to the unit Fitting a subsidiary inlet spigot The subsidiary inle...

Страница 3: ...it grille T1 balancing plate fitted behind filter in separate water closet T1 Water Closet T1 T2 T2 Main room with additional utility room en suite bathroom and water closet T2 Bathroom T2 Water Close...

Страница 4: ...y to full speed 100 The performance of the unit can be reduced if required by rotating the screw anti clockwise Fully anti clockwise will give 50 of the available duty Adjusting the Low Speed normal t...

Страница 5: ...nit is totally isolated from the electrical supply This is particularly important when dealing with a run on circuit as input socket terminals within these units remain live even when the room light o...

Страница 6: ...considered Lifting gear such as slings or ropes must be arranged so as not to bear on the casing 3 3 Equipment stored on site prior to installation should be protected from the weather and steps taken...

Страница 7: ...eded for dwellings assessed under The Building Regulations 2010 specifically SAP 2009 and Approved Documents L and F Completion of this document is therefore only required for dwellings assessed by SA...

Страница 8: ...ts diffusers or to overcome particular obstructions If flexible ducting has been used has it been pulled taut to minimise system resistance Has the number of duct bends been minimised to ensure adequa...

Страница 9: ...ave all the fans been mounted and installed inline with the IEE wiring regulations Has the unit been installed in a position that will permit access for maintenance purposes Have all grilles or ductwo...

Страница 10: ...lectrical Connection Decision Yes No or N A Has the rating label been verified to establish suitability for the installation strategy and whether an earth is required e g voltage class I or II product...

Страница 11: ...s having a minimum equivalent area of 2 500mm are fitted in each room except wet rooms from which air is extracted Where this approach causes difficulties e g on a noisy site seek expert advice Have t...

Страница 12: ...dvice Decision Yes No or N A Has the customer been supplied with suitable documentation detailing maintenance and operational requirements Has the customer been advised not to seal natural air flows f...