Unit must not be switched off, product is 

designed to run continuously.

Please ensure the unit is isolated before 

removing the cover.

5

24. 06. 13. Leaflet Number 671078

Installation and Maintenance

MEV-B Continuous Mechanical Extract Ventilation Units

Earth
post

Fan 
terminal
block

Fan 
terminal
block

N
L

Fuse 2A max.

Unit serving
Kitchen and Bathroom

230V
1ph 
50Hz
supply

3
1
N
L

2

Room
light

Normal /Boost
switch (kitchen) not supplied

Light switch 
(bathroom)

Light switch 
(double pole)

Earth
post

N
L

Fuse 2A max.

Unit serving
Kitchen and two Bathrooms

230V 
1ph 
50Hz
supply

3
1
N
L

2

Room
lights

Normal /Boost
switch (kitchen) not supplied

Earth
post

Fan 
terminal
block

N
L

Fuse 2A max.

Unit serving
Kitchen and Utility 
and Bathroom

230V 
1ph 
50Hz
supply

3
1
N
L

2

Room
light

Normal /Boost
switch kitchen 
(Not Supplied)

Normal /Boost
switch utility 
(Not supplied)

Light switch 
(bathroom)

Figure 8.  Wiring for various unit applications.

Unit Wiring

Full speed operation with trickle ventilation 

(figure 8)

Wiring for full speed operation with trickle ventilation. 

Note: Trickle vent (NORMAL) adjustment screw on Electronic

Control Module must be set to a minimum of 25%

and full

speed (BOOST) set to 100%.

Maintenance

General

Note: Installation and maintenance of the equipment must be

as directed in the instructions provided with the unit.

It is inevitable that some dust, fluff etc. will pass through the 

filter, and which, if allowed, will build up internally on motors

and impellers, shortening the life of the unit and, in severe cases,

leading to overheating of the motors.

Consequently, it is strongly recommended that all units are

inspected and cleaned every six months.  To clean the filter,

remove from the unit and wash in tepid water to which a little

mild detergent has been added.  Shake out excess water and

allow to dry naturally.  Replace when dry.

Isolation

Ensure that the unit is totally isolated from the electrical supply.

This is particularly important when dealing with a run-on circuit

as  input socket terminals within these units remain live,

even when the room light or other  actuating switch is off.

Take care therefore when working within the case with the fan

module removed.

Procedure for inspection and cleaning

At all times, take care not to damage, distort or disturb the 

balance of the impellers.  Remove the cover and lift up the 

electronic module to disconnect the spade terminals. Remove the

electronic module complete with the fan module after releasing

the four fan module retaining  screws.  Inspect all parts.  With a

brush or dry cloth clean the backplate.  Lightly brush away dust

and dirt from the fan module.  If stubborn debris persists, 

carefully remove with a suitable blade or scraper.  Wash the

cover in warm soapy water.  Dry thoroughly.  Refit the fan 

module and electronic module 

followed by the cover. Test/run.

Replacement of Parts

Should any component need replacing Nuaire keep extensive

stocks for quick delivery. Ensure that the unit is electrically 

isolated, before carrying out any work.

When ordering spare parts, please quote the serial number of 

the unit and the ARC number of the purchase if possible.

(This information will be available on the fan label).

3 Year Warranty

The 3 year warranty starts from the day of delivery and

includes parts and labour for the first year.

The remaining 2 years covers replacement parts only. 

This warranty is conditional on planned maintenance being

undertaken.

Service Enquiries

Nuaire can assist you in all aspects of service. Our service

department will be happy to provide any assistance required, 

initially by telephone and If necessary arrange for an engineer 

to call within 48 hours if possible

.

Technical Support

029 2085 8400

Spares

MEV single and twin fans

ITEM

PART No.

Foam Filter

772275

Remote Switch

773532

ELECTRONIC CONTROL MODULE

Single fan MEV-B

772270

Twinfan MEV-2B

772271

BLOWER ASSEMBLIES

MEV-B single fan units

772273

MEV-2B twin fan units 

772274

Содержание MEV-B

Страница 1: ...reduce performance if necessary The unit is delivered with the BOOST speed adjustment set to 100 See the adjustments information on page 4 Coding MEV B Single fan unit MEV 2B Twin fan unit with auto...

Страница 2: ...it casing Connect the ductwork to the outlet spigot and fix the unit to the surface Any subsidiary inlet ductwork can now be connected to the unit Fitting a subsidiary inlet spigot The subsidiary inle...

Страница 3: ...it grille T1 balancing plate fitted behind filter in separate water closet T1 Water Closet T1 T2 T2 Main room with additional utility room en suite bathroom and water closet T2 Bathroom T2 Water Close...

Страница 4: ...y to full speed 100 The performance of the unit can be reduced if required by rotating the screw anti clockwise Fully anti clockwise will give 50 of the available duty Adjusting the Low Speed normal t...

Страница 5: ...nit is totally isolated from the electrical supply This is particularly important when dealing with a run on circuit as input socket terminals within these units remain live even when the room light o...

Страница 6: ...considered Lifting gear such as slings or ropes must be arranged so as not to bear on the casing 3 3 Equipment stored on site prior to installation should be protected from the weather and steps taken...

Страница 7: ...eded for dwellings assessed under The Building Regulations 2010 specifically SAP 2009 and Approved Documents L and F Completion of this document is therefore only required for dwellings assessed by SA...

Страница 8: ...ts diffusers or to overcome particular obstructions If flexible ducting has been used has it been pulled taut to minimise system resistance Has the number of duct bends been minimised to ensure adequa...

Страница 9: ...ave all the fans been mounted and installed inline with the IEE wiring regulations Has the unit been installed in a position that will permit access for maintenance purposes Have all grilles or ductwo...

Страница 10: ...lectrical Connection Decision Yes No or N A Has the rating label been verified to establish suitability for the installation strategy and whether an earth is required e g voltage class I or II product...

Страница 11: ...s having a minimum equivalent area of 2 500mm are fitted in each room except wet rooms from which air is extracted Where this approach causes difficulties e g on a noisy site seek expert advice Have t...

Страница 12: ...dvice Decision Yes No or N A Has the customer been supplied with suitable documentation detailing maintenance and operational requirements Has the customer been advised not to seal natural air flows f...

Отзывы: