background image

Page 5 

 

 

 

 

 

 

 

 

 

 

        INST2063 - 6/14 

Maintenance 
 

 

The only maintenance required is the annual replacement of the Ionizer to ensure maximum 
effectiveness of the ionizer.  It is required to return the expired device to NRD for proper 
disposal. 

 

Calibration is not required. 

 
 
 
 
 
5.0

 

   Trouble Shooting Guide 

 

Symptom 

Probable Cause 

Corrective Action 

 
1.

 

Static charges are not      
eliminated 

 
Ion cell may be out of date and 
need replacement. 
 
Possible oil contamination of ion 
cell. 
 
 
Ions generated are being 
recombined before they reach the 
charged surface. 

 
Call NRD for Ion Cell 
replacement. 
 
Return cell to NRD for 
evaluation.  Do not attempt to 
clean the device. 
 
Position the fan closer to the 
charged part. 
 

 
2.

 

Fan does not turn on 

 
No power. 
 
Blown fuse internal to fan. 

 
Check outlet and breakers. 
 
Check for visible damage to 
power cord.  Return fan to NRD 
for evaluation. 

 
 

Содержание Nuclecel P-2063

Страница 1: ...63 Nuclecel Ionizer Accessories CONTENTS 1 0 Introduction Page 1 1 1 Our Thanks 1 2 Other NRD Products 1 3 Customer Support 2 0 General Information Page 2 2 1 Safety of NRD Devices 2 2 Lease Agreement 2 3 Return of Expired Devices Page 3 3 0 Model P 2063 Nuclecel Ionizer 4 0 Accessories Page 4 4 1 Model 4064 Fan 5 0 Troubleshooting Page 5 APPENDIX Data Sheet Specifications Page 6 Safety Brochure ...

Страница 2: ...or control electrostatic charges The many product configurations we offer will fit a wide field of applications Just call us with your application and we can provide a solution The electronics industry uses air ionizers to reduce product damage and loss Application of ionizers in the printing converting and graphics industries allow in process cleaning of product and faster process speeds Higher p...

Страница 3: ...bject or attempt to clean the inside of the cell Mount the ion cell in a normal way by using the mounting posts of the ion cell Do not alter the ionizer in any way i e drilling holes Contact us for mounting options Review the enclosed Safety Brochure for a more detailed description of how the ionizers work where they are typically used and the general safety of NRD ionizers 2 2 Lease Agreement All...

Страница 4: ...to the ion cell can also be effectively neutralized without the need of air movement 3 1 Installation Operation A One common method to install the P 2063 Nuclecel Ionizer is by using spring clips that will snap on to the posts of the Ionizer The spring clips can be attached to a mounting base There are other methods to mounting the cell but cannot involve modifying the Ionizer Do not alter the P 2...

Страница 5: ...the below diagram showing the installation of the P 2063 Nuclecel Ionizer Snap in the Ionizer by aligning the Ionizer posts with the spring clips The orientation of the Ionizer does not matter since it is symmetrically designed D Re assemble the front blower housing and tighten the two phillips head screws Tightening the screws will secure the ion cell inside the fan assembly E Position the Fan As...

Страница 6: ...e Action 1 Static charges are not eliminated Ion cell may be out of date and need replacement Possible oil contamination of ion cell Ions generated are being recombined before they reach the charged surface Call NRD for Ion Cell replacement Return cell to NRD for evaluation Do not attempt to clean the device Position the fan closer to the charged part 2 Fan does not turn on No power Blown fuse int...

Отзывы: