
NOVOTEST.UT-1.000 O.M.
Operation manual
Ultrasonic Thickness Gauge NOVOTEST UT-1M
Page. 9
2. INTENDED USE
2.1 Operational limitations
Operation of the device must be carried out under the influence of factors and taking into account
the parameters of the monitored facilities in accordance with the specified technical characteristics,
and the device must be used within its technical specifications.
Only the user familiar with the operational documentation for this device is allowed to work with
the instrument.
To prevent the device from failing due to condensation, after moving the unit from cold to a warm
place, leave it in the package for at least 2 hours.
2.2 Preparing for use
2.2.1 Visual inspection
Inspect the device ensure that there is no mechanical damage to the information processing unit,
transducer, cable plugs and sockets.
2.2.2 Installing the batteries
Insert the batteries into the battery compartment by opening the battery cover lightly and pulling it
down until the cover is completely detached. The batteries are to be installed according to the polarity
indicated on the device. Close the battery cover until it clicks.
2.2.3 Connecting the probe
Using the connecting cable, connect the desired probe to the sockets on the upper end surface of
the housing. The generator must be connected to the left socket (marked with a red label); the
transducer’s receiver must be connected to the right socket.
Figure 2.1 - Connecting probe.
Caution!
To prevent damage to the connectors and cables, follow the instructions for using the connectors
below!