5. Final Inspection
•
Check all safety devices of the door and if necessary readjust them
.
•
Check all door functions against the checklist and sign off
the completed list.
•
Fill out the CE declaration of conformity. Deliver the door to the customer in accordance with
CE directives.
(The CE Declaration can be found in the user manual as an appendix.)
We declare that we have complied
with the manufacturer's
instructions in accordance with
eN13241-1 Commercial door
systems product norm
attachment IIA
.
Installation company:
Street and property number:
Postcode / Place:
Phone / fax:
Place of delivery:
Date:
Name of engineer:
Signature of engineer:
CHECK
✔
✔
✔
✔
✔
✔
✔
✔
✔
1
2
3
4
5
6
7
8
9
10
11
Conformity
✔
✔
✔
✔
✔
✔
✔
✔
✔
1
2
3
4
5
6
7
8
9
10
11
Checklist
Declaration from engineer and/or installation firm
Company stamp
Control box
approved
23. Push buttons on the box
24. Stop switch
25. General cabling
Controls
approved
26. Push buttons*
27. Pull switch*
28. Pho reflector *
29. Radar *
30. Induction loop *
31. Receiver *
32. Hand-held transmitter *
33. Key switch *
Security
approved
34. Safety photocell *
35. Safety edge protection *
36. Light screen *
37. Iris *
Hood *
approved
38. Attachment
39. Seal tightness
Miscellaneous
approved
40. Maintenance sticker
41. Type plate
* if applicable
6
7
8
9
10
Location of the door:
Door plate
approved
1. Condition of door panel
2. Attachment to door roller
3. Attachment to bottom beam
4. Welds in door panel
5. Mounting clamp blocks
Bottom beam
approved
6. Guides
7. Floor rubber
8. Break-Away *
Guide rail
approved
9. Column attachment
10. Console attachments
11. Dents / scratches
Commissioned on:
Drive
approved
12. Attachment
13. Leaks
14. Motor brake
15. Adjustment limit switches
Tensioning and
balancing system *
approved
16. Tension belt / elastic
17. Fastening tension belt / elastic
18. Return pulleys
19. Roll-up disks
20. Tension spring *
21. Buckle loops
22. Buckle tightened
3
5
4
2
1
GB
GB