NOVO 475 PRO SERIES Скачать руководство пользователя страница 1

   

How To Install, Operate and 

Maintain Your Reverse Osmosis 

System 

In

stal

lation an

d  

Oper

ation M

anual

 

475 PRO SERIES 

475BP PRO SERIES 

PLEASE READ ALL INSTRUCTIONS BEFORE INSTALLING 

AND USING THIS SYSTEM 

FILTER CARTRIDGE CONFIGURATION MAY BE SUBJECT TO  CHANGE. 

REVISION # 

REVISION DATE  JUNE 14/12 

Содержание 475 PRO SERIES

Страница 1: ...rse Osmosis System Installation and Operation Manual 475 PRO SERIES 475BP PRO SERIES PLEASE READ ALL INSTRUCTIONS BEFORE INSTALLING AND USING THIS SYSTEM FILTER CARTRIDGE CONFIGURATION MAY BE SUBJECT...

Страница 2: ...475 Pro Series systems use four stages of treatment to filter your water Stage 1 Remove sand dirt sediment Stage 2 Remove chlorine taste odors very fine particulates Stage 3 Reduce total dissolved min...

Страница 3: ...installed to provide the feed water for these features but you should consult your fridge owners manual for further in formation Guidelines for component placement are as follows Faucet should be plac...

Страница 4: ...vide great tasting drinking water 5 Storage Tank 3 0 Gal holds filtered water ready for use 6 Self piercing Inlet Saddle Valve is connected to the cold water line to supply water to the RO system 7 Fa...

Страница 5: ...small indent at the desired faucet location 2 flat surface is required not exceeding 1 1 4 in thickness Drill the 1 8 pilot hole Drill the hole for the faucet shank to fit through Clean up sharp edge...

Страница 6: ...e screw head out from the wall 3 Install the mounting bracket slots over the screws and hang the unit NOTE THE UNIT MUST BE INSTALLED BY HANGING THE BRACKET ON THE WALL SO THAT THERE IS NO WEIGHT ON T...

Страница 7: ...it 4 Connect tubing from drain valve to RO unit 5 Check all connections to be sure they are secure 6 Turn on feed water valve and check for leaks turn off and correct leaks if leaks occur 1 2 3 4 5 7...

Страница 8: ...e is fully closed 2 Turn storage tank valve clockwise to close 3 Open faucet to relieve pressure 4 Remove quick connect fittings from R O Membrane 5 Connect new R O Membrane 6 Turn water supply back o...

Страница 9: ...idge 2 Inlet solenoid valve not working 2 Repair or replace solenoid valve System does not shut off 1 High pressure switch not working 1 Repair or replace high pressure switch Abnormal pump cycling no...

Страница 10: ...ADDLE VALVE 10 65030027 WASTE WATER SADDLE 11 70030022 BOOSTER PUMP 475 PRO SERIES 12 70030041 TANK CUT OUT PRESSURE SWITCH 13 70030032 LOW PRESSURE SWITCH 14 70030026 TRANSFORMER 475 BOOSTER PUMP 15...

Страница 11: ...lectrical Diagrams 475 Pro Series No Pump 475BP Pro Series With Pump Wiring Diagram 475BP Pro Series With Pump TO DRAIN INLET TO DRAIN INLET PRE CARBON POST CARBON 3 0 GAL TANK PRE SEDIMENT PRE CARBON...

Страница 12: ...eriod of two 2 years from the date of manufacture or date of purchase when verified by a bill of sale Novo will replace any part which fails two 2 years from date of manufacture as indicated by the se...

Отзывы: